Collaborative leader with dedication to partnering with coworkers to promote engaged, empowering work culture. Documented strengths in building and maintaining relationships with diverse range of stakeholders in dynamic, fast-paced settings. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals. Forward-thinking team leader skilled at operating departments efficiently to meet goals. Successful background matching employees with roles for maximum performance. Proactive and hardworking individual focused on continuous operational improvement.
Overview
28
28
years of professional experience
5
5
years of post-secondary education
Work History
Operation Manager
Vero Engineering Pte Ltd
08.2023 - Current
Reduced turnaround time for project completion through effective resource allocation and team management.
Developed robust contingency plans to ensure business continuity during unforeseen disruptions.
Facilitated smooth collaboration between departments through clear communication channels.
Analyzed data trends to identify potential bottlenecks in operations workflow, implementing strategies to mitigate risks accordingly.
Spearheaded process improvements, resulting in increased productivity and reduced operational costs.
Managed budgets effectively, consistently delivering projects on-time and within financial constraints.
Championed safety protocols to maintain a secure working environment, reducing workplace accidents significantly.
Implemented quality control systems that boosted overall product consistency and reliability.
Developed strong relationships with vendors, resulting in better pricing and improved service quality.
Optimized supply chain operations through strategic vendor partnerships and efficient logistics planning.
Empowered employees to take ownership of their responsibilities, leading to increased accountability and improved performance outcomes.
Implemented new inventory management system to optimize stock levels and reduce waste.
Enhanced customer satisfaction by establishing clear communication channels and addressing concerns promptly.
Increased profit by streamlining operations.
Introduced new methods, practices, and systems to reduce turnaround time.
Partnered with vendors and suppliers to effectively manage and budget.
Negotiated contracts with vendors and suppliers to obtain best pricing and terms.
Monitored daily cash discrepancies, inventory shrinkage and drive-off.
Managed purchasing, sales, marketing and customer account operations efficiently.
Trained and guided team members to maintain high productivity and performance metrics.
QC Manager
Shing Leck Engineering Service Pte Ltd
06.2014 - 07.2023
Implemented data-driven strategies to identify trends in product defects and take corrective action accordingly.
Developed detailed understanding of industry regulations and ensured full compliance within company operations.
Conducted regular audits of suppliers to verify adherence to quality standards and address any potential concerns proactively.
Developed effective communication channels to keep relevant stakeholders informed on QC progress and any issues encountered.
Championed continuous improvement initiatives that led to significant enhancements in product quality over time.
Maintained organized and efficient workspace, fostering productive environment for entire QC team.
Managed high-performing QC team, providing guidance, support, and mentorship as needed.
Leveraged strong analytical skills to accurately interpret data and make informed decisions regarding product quality initiatives.
Played instrumental role in achieving coveted industry certifications that contributed positively to company's reputation in marketplace.
Streamlined QC processes for increased efficiency and reduced production downtime.
Established proactive approach to problem-solving, preventing potential issues before they escalated into major setbacks.
Developed and analyzed quality control processes and deliverables to determine present standards and establish recommended action plans.
Documented inspection results by completing logs.
Collaborated with development teams, internal customers, and product line management to verify delivery of desired quality requirements to distributors.
Established and tracked quality department goals and objectives.
Tracked quality issues with external customers, suppliers, and internal plant operations.
Determined quality department standards, practices, and procedures.
Scheduled and chaired quality review meetings to review effectiveness of performance mitigating risk, improving throughput and achieving customer satisfaction.
QC Supervisor
PEC Ltd
03.2006 - 05.2014
Trained new QC personnel in company standards, ensuring compliance with industry regulations and best practices.
Implemented preventive maintenance programs for lab equipment, reducing instances of machine failure or malfunctions during critical testing periods.
Reduced production errors through rigorous quality inspections and timely corrective actions.
Contributed to continuous improvement initiatives within organization by actively participating in Lean Six Sigma projects focused on waste reduction and efficiency gains.
Ensured accurate documentation of inspection results, maintaining comprehensive database for future reference and analysis.
Served as liaison between Quality Control department and other business units during customer audits or third-party inspections.
Maintained safe working environment by enforcing adherence to safety guidelines and promoting culture of responsibility among staff members.
Supervised and directed quality control personnel through effective mentoring, coaching and work delegation.
Supported audits and led teams to fully investigate quality control processes and root out deficiencies.
Developed and initiated standards and methods to fully inspect, test and evaluate materials and completed work in Process Construction and Maintenance industry settings.
Directed consistent measuring, inspection and testing procedures and tabulated data for detailed reports.
Monitored daily and weekly key performance indicators to maintain on-track status.
Senior Construction Engineer
EEI Corp
02.2001 - 11.2005
Resolved conflicts among team members for more cohesive working environment that fostered greater productivity.
Coordinated with regulatory agencies to obtain necessary permits and approvals for construction projects.
Contributed to business development efforts by assisting in proposal writing and client presentations.
Mentored junior engineers, fostering professional growth and knowledge sharing among team members.
Evaluated subcontractor performance to ensure quality workmanship while maintaining schedule adherence.
Developed comprehensive project schedules to track progress and identify potential delays or setbacks early on.
Streamlined change order processes to minimize disruptions and maintain project momentum toward completion goals.
Increased safety on job sites by implementing rigorous safety protocols and regular inspections.
Conducted thorough site investigations to identify potential issues before start of construction activities.
Optimized resource allocation by effectively managing personnel, equipment, and material resources across multiple projects.
Improved project efficiency by streamlining communication between architects, contractors, and clients.
Led weekly progress meetings with key stakeholders to review accomplishments, address concerns, and set priorities for upcoming tasks.
Reviewed engineering drawings for accuracy during design phases ensuring smooth transition into construction phase.
Construction Field Engineer
EEI Corp
11.1997 - 11.2000
Improved project efficiency by implementing innovative construction techniques and processes.
Established strong relationships with suppliers, negotiating favorable pricing terms while maintaining highest quality standards for materials used in projects.
Enhanced team productivity through effective communication and coordination of on-site activities.
Optimized material usage through strategic planning, minimizing waste and reducing overall costs for clients.
Ensured safety compliance by conducting regular inspections and enforcing strict adherence to regulations.
Conducted thorough site evaluations, identifying potential issues early to avoid costly delays or design modifications later in project timeline.
Effectively managed subcontractors under tight deadlines while maintaining open lines of communication regarding expectations.
Expedited project completion timelines by effectively managing scheduling conflicts and overcoming unforeseen obstacles.
Delivered high-quality workmanship with meticulous attention to detail, resulting in superior client satisfaction.
Created project schedules and worked with contractors to assure work is completed properly and on time.
Acted as contact for client's communication with field personnel.
Visited project sites during construction to monitor progress and consult with contractors and on-site engineers.
Cadet Engineer
Hideco Sugar Milling Co.
10.1995 - 09.1997
Evaluated vendor proposals for equipment procurement, ensuring optimal quality at competitive prices.
Performed thorough testing on developed prototypes, validating functionality before proceeding to production phase.
Participated in quality assurance initiatives, conducting regular inspections and audits to ensure highest level of product performance and reliability.
Conducted extensive research on emerging technologies, keeping company at forefront of industry advancements.
Identified opportunities for process improvements through data analysis and lean methodologies implementation.
Provided technical support during installation and commissioning phases, resolving issues promptly to minimize downtime.
Participated in continuous learning programs to maintain expertise in current engineering practices and software tools.
Assisted senior engineers in designing complex systems, ensuring compliance with industry standards and regulations.
Performed preventive maintenance procedures on vessels.
Oversaw scheduled and corrective maintenance of Boiler Room, Turbine and Conveying systems.
Completed frequent inspections, identified concerns and corrected problems independently.
Performed thorough, accurate and efficient repairs and preventive maintenance.
Performed or participated in emergency drills as required.
Performed daily log updates and generated reports for supervisors.
Maintained clean, organized and safe engine rooms always ready for team and USCG inspections.
Education
Bachelor of Science - Mechanical Engineering
West Negros College
Bacolod City, Philippines
06.1990 - 03.1995
Skills
Customer Service
undefined
Timeline
Operation Manager
Vero Engineering Pte Ltd
08.2023 - Current
QC Manager
Shing Leck Engineering Service Pte Ltd
06.2014 - 07.2023
QC Supervisor
PEC Ltd
03.2006 - 05.2014
Senior Construction Engineer
EEI Corp
02.2001 - 11.2005
Construction Field Engineer
EEI Corp
11.1997 - 11.2000
Cadet Engineer
Hideco Sugar Milling Co.
10.1995 - 09.1997
Bachelor of Science - Mechanical Engineering
West Negros College
06.1990 - 03.1995
Similar Profiles
NAW WONDER NAINGNAW WONDER NAING
Quantity Surveyor Cum Site Engineer at Witflux Engineering Pte Ltd/ Audimars Buildtech Pte LtdQuantity Surveyor Cum Site Engineer at Witflux Engineering Pte Ltd/ Audimars Buildtech Pte Ltd
WSH COORDINATOR CUM ECO at KIM SENG HENG ENGINEERING CONSTRUCTION (PTE) LTD, UNIVERSAL PTE LTDWSH COORDINATOR CUM ECO at KIM SENG HENG ENGINEERING CONSTRUCTION (PTE) LTD, UNIVERSAL PTE LTD