Summary
Overview
Work History
Education
Skills
Profile
References
Projects
Timeline
Generic
Izzuddin Muhiyuddin

Izzuddin Muhiyuddin

Assistant Manager
Kuala Lumpur

Summary

Proficient Engineer and Project Manager with 9 years of experience successfully leading over 20 projects to completion. Expertise in managing technical teams, ensuring projects are delivered on time, within budget, and to specification. Skilled in Distributed Control Systems (DCS), control system design, and project engineering and management.

Overview

12
12
years of professional experience

Work History

ASSISTANT MANAGER

Yokogawa Electric (M) Sdn Bhd
4 2022 - Current
  • Project Management from initiation, planning, budgeting, execution and control for project delivery
  • Review customer project contractual, technical, product specification, and standard requirements
  • Coordination with vendors and subcontractors for technical and other issues to meet delivery schedule
  • Mentored junior staff members in their professional development by offering guidance/support in their assigned roles.
  • Offered hands-on assistance to customers, assessing needs, and maintaining current knowledge of consumer preferences.

SENIOR ENGINEER

Yokogawa Electric (M) Sdn Bhd
04.2019 - 03.2022
  • Provides leadership in the Project management and successful execution of projects as assigned by Manager
  • Support PM in terms of managing project cost, schedule and requirements for Service Projects
  • On-site commissioning, start-up support, on-site emergency and troubleshooting support as Project Lead
  • Technical responsibility for all aspects of design, installation, and commissioning of Yokogawa DCS systems.
  • Designed system architecture for the implementation of cybersecurity network for Petronas projects. The design incorporated the integration of Nozomi network system, alongside Domain Controller, NSG, Backup Recovery Server, WSUS, AVPM Server and Log Collector into the network.

SYSTEM SERVICE ENGINEER

Yokogawa Electric (M) Sdn Bhd
04.2015 - 03.2019
  • Responsible for extensive project engineering of Distributed control system (DCS)
  • Analyze customer's DCS functional requirements and work with customer's engineers towards sensible system solutions
  • Co-ordinate internal tests, Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT)
  • Responsible for correct technical design, implementation and testing for part of scope as assigned to within timeframes as agreed.

PROJECT ENGINEER

Sepangar Bay Power Corporation Sdn. Bhd.
02.2013 - 03.2015
  • Assist superior in the management of power projects undertaken by AsiaPacific Businesslink Sdn and its Group of Companies
  • Involve in the O&M activities of power stations
  • Collaborate with consultant and other project team to ensure feasible engineering design
  • Filing of projects documentation.

Education

Bachelor's Degree - Electrical Engineering

University of Nottingham Malaysia
04.2001 -

Skills

Project Management and Engineering

Yokogawa Centum VP, CS3000 & Centum CS UNIX

Distributed Control System, DCS

OT Network Monitoring, Cyber Security & Management

Modbus, Foundation Fieldbus, Profibus

Plant Resource Manager, PRM

Open Platform Communications, OPC

Microsoft Office Packages

Profile

Muhammad Izzuddin B. Muhammad Muhiyuddin

13A-12A, Metropolitan Square Condominium, Jalan PJU 8/1, 

Damansara Perdana, Petaling Jaya, 47820, Selangor, Malaysia

+60133235326

izzuddin.muhiyuddin@gmail.com

References

  • Zaid Harithah Bin Mohd Badry

      Senior Measurement Engineer

      Orsted Malaysia 

     +0133428168

  • Mohd Faisal bin Ahmad

      Instrument and Control Staff Engineer

      Petronas Chemicals MTBE Sdn Bhd

     +60192108033

  • Wan Mohd Saifullah bin Wan Saudi

      Senior Executive Instrument and Control

       Petronas Carigali Sdn Bhd

     +60111144188

Projects

LNG Amani IAS Software Upgrade Project

Role: Project Manager

End User: LNG Amani, Brunei Gas Carriers (BGC)

January'2024 - Current

System: Centum VP, Prosafe-RS

· Project management from initiation, planning, budgeting, quotation, PO and project execution.

· DCS software upgrade to the latest version.

· To implement Ethernet network for workstation communication to replace existing V-Net Open Communication protocol.


LCTM NC2 and BD/OCU/TBA DCS Migration Project

Role: Lead Engineer

End User: Lotte Chemical Titan (M) Sdn Bhd

December’2023 - June’2024

System: Centum VP, Prosafe-RS

·  Field Control Station and associated IO modules migration to F-IO type hardware.

· DCS software upgrade to the latest version.

· New operator console installation, pushbuttons, buzzers and soft mimic annunciator displays.


K101B Local Panel Upgrade Project

Role: Project Manager

End User: Petronas Penapisan (T) Sdn Bhd

May’2023 - February’2024

System: Centum VP

· Project management from initiation, planning, budgeting, quotation, PO and project execution.

· K101B Off Gas compressor local control panel upgrade.

· Upgrade Field instrument switches to transmitter with diagnostic features.

· Convert relay-based logic to DCS logic.


EMA-1 DCS Upgrade Project

Role: Project Manager

End User: Rikevita (M) Sdn Bhd

April’2023 - December’2023

System: Centum VP

·  Project management from initiation, planning, budgeting, quotation, PO and project execution.

·  DCS software & hardware upgrade to Centum VP R6 and F-IO hardware.

·  Installation of HART multiplexers to enable asset monitoring via PRM.


SLS/SLES Project

Role: Lead Engineer

End User: Global Eco Chemicals (M) Sdn Bhd

June’2022 - April’2023

System: Centum VP

·  SLS and SLES Plant expansion.

·  Modification of Yokogawa Process Automation System (PAS) due to change of plant operation philosophy.


DCS Hardware Upgrade Project

Role: Project Manager

End User: Mewah Oils Sdn Bhd

February’2022 - December’2022

System: Centum VP

· Project management from initiation, planning, budgeting, quotation, PO and project execution.

· DCS Field Control Station RIO migration to N-IO type hardware.


EMA-2 DCS Upgrade Project

Role: Lead Engineer

End User: Rikevita (M) Sdn Bhd

October’2021 –January’2022

System: Centum VP

· DCS software & hardware upgrade to Centum VP R6 and F-IO hardware.

· Replacement of system and marshalling cabinets.


LCTM NC1 DCS Migration Project

Role: Lead Engineer

End User: Lotte Chemical Titan (M) Sdn Bhd

November’2020 –September’2021

System: Centum VP

· Field Control Station and associated IO modules migration to F-IO type hardware.

· New operator console installation, pushbuttons, buzzers and soft mimic annunciator displays.


DCS Software & Hardware Upgrade Project

Role: Lead Engineer

End User: Petronas Chemicals MTBE Sdn Bhd

August’2020 -April’2021

System: Centum VP, Cybersecurity

· DCS Field Control Station RIO migration to N-IO hardware.

· Cyber Security; assist vendor (Nozomi) to deploy OT asset management for Yokogawa DCS.


LNG ARKAT IAS Upgrade Project

Role: Lead Engineer

End User: LNG Arkat, Brunei Gas Carriers (BGC)

May’2020 -October’2020

System: Centum VP

· IAS Upgrade to Centum VP R6.

· Profibus, STAHL hardware upgrade.


LCTM ICSS Software and Hardware Upgrade Project

Role: Lead Engineer

End User: Lotte Chemical Titan (M) Sdn Bhd

October’2019 - April’2020

System: Centum VP

· DCS software upgrade to Centum VP R6 for TBA, OCU and BD Plants.

· BTX Field Control Station migration to N-IO hardware.

· Boiler G & H controller upgrade.


DCS Upgrade Project

Role: Lead Engineer

End User: Petronas Chemicals LDPE Sdn Bhd

February’2019 - September’2019

System: Centum VP, Cybersecurity

· Yokogawa Centum R4 DCS software upgrade to Yokogawa Centum VP R6.

· Installation of Plant Resource Manager (PRM) software, Cisco Firewall ASA 5580-X, Windows Server Update Services (WSUS), McAfee ePolicy Orchestrator and SilentDefense Command Center for network monitoring enhancement.


SIS & FGS Upgrade Project

Role: Lead Engineer

End User: Petronas Regas Terminal Sg Udang

January’2019 -May’2019

System: Centum VP, Prosafe-RS

· Yokogawa Centum R4 DCS software upgrade to Yokogawa Centum VP R6.

· Installation of Plant Resource Manager (PRM) software, Network Time Server NTS 03-G+, Cisco Firewall ASA 5500-X, Windows Server Update Services (WSUS) and McAfee ePolicy Orchestrator.


DCS Upgrade Project

Role: Lead Engineer

End User: Petronas Carigali Sdn Bhd, Bintulu Integrated Facility (BIF)

January’2018 - December’2018

System: Centum VP

· Facility Improvement Program - Yokogawa DCS Upgrade.

· DCS upgrade of existing system Centum CS to Yokogawa Centum  VP R6.


DCS Upgrade Project

Role: Lead Engineer

End User: Polyplastics Asia Pacific Sdn Bhd

October’2017 - December’2017

System: Centum VP

· Yokogawa Centum CS3000 DCS FCS Database upgrade to Yokogawa Centum VP R5.

· DCS interlock testing prior to plant start-up (Monomer, Polymer & Utility).


DCS Upgrade Project

Role: Lead Engineer

End User: Petronas Chemicals Ammonia Sdn Bhd

January’2017 - September’2017

System: Centum VP

· Upgrade existing RIO DCS hardware to FIO.

· Upgrade EXA-packages (solution) software to the latest version for compatibility purpose.


PGW2 Plant Expansion Project

Role: Lead Engineer

End User: CCM Chemicals Sdn Bhd

June’2016 - December’2016

System: Centum VP

· Tie-in newly added anthracite filter signals at PGW-2 Plant to the Distributed Control System (DCS) to enable remote monitoring and operation.

· Tie-in signals of the new 100 TPD Chlorine Liquefaction and related ancillary process units to the Distributed Control System (DCS) for process monitoring and control purpose.


CCR Refurbishment Project

Role: DCS Engineer

End User: Petronas Sabah Oil & Gas Terminal (SOGT)

February’2016 - May’2016

System: Centum VP

· Yokogawa System at CCR & SOCC - Relocation from CCR & SOCC to temporary location and tie-in to new CCR upgraded console.


Plant 4 (P4B) Extension Project and Field Control Station Load Shedding

Role: Lead Engineer

End User: KL-Kepong Oleomas Sdn Bhd

October’2015 - February’2016

System: Centum VP

· Tie-in signals of the new KLKO P4B Plant operation to the Distributed Control System (DCS) to enable remote monitoring and operation.


DCS Upgrade Project

Role: DCS Engineer

End User: Petronas Chemicals Methanol Labuan (PML2)

June’2015 - September’2015

System: Centum VP

· PCMLSB (plant2) DCS upgrade of existing system CS3000 R3 to Yokogawa Centum VP R5 for facility monitoring, operation and safeguarding.

Timeline

SENIOR ENGINEER

Yokogawa Electric (M) Sdn Bhd
04.2019 - 03.2022

SYSTEM SERVICE ENGINEER

Yokogawa Electric (M) Sdn Bhd
04.2015 - 03.2019

PROJECT ENGINEER

Sepangar Bay Power Corporation Sdn. Bhd.
02.2013 - 03.2015

Bachelor's Degree - Electrical Engineering

University of Nottingham Malaysia
04.2001 -

ASSISTANT MANAGER

Yokogawa Electric (M) Sdn Bhd
4 2022 - Current
Izzuddin MuhiyuddinAssistant Manager