I have got Degree of Bachelor of Engineering (B.E-Mechanical) from West Yangon Technological University, Myanmar. I have nearly six years experience in Facilities Management, Design Drafting and 3D Modelling. I am confident that with my experience, academic backgrounds and skills, eagerness to learn, motivation to succeed that I will be able to make significant contributions in your organization. You have my assurance that I am also a dedicated and hardworking team player.
Overview
7
7
years of professional experience
1
1
Certification
Work History
Technical Officer
Kim Yew Integrated Pte.,ltd
01.2022 - Current
Water system for Nanyang Technology University
Computed Management Maintenance System
Assigned technician for CMMS and check all the detail of servicing photos and service report before submitting to client
Meter Reading for water usage
Water meter reading key in excel and monitoring for prevent unnecessary 60% water leaking usage
Manpower Management for general work scope
Planned and implemented maintenance program for technicians
Grey Water system for sustainability
Maintain the pump and all fittings are normal
Irrigation system
Maintain the pump and all fittings are normal
Water feature, fountain maintenance
Monitor the water quality, test result and pump system
Water tanks maintenance and washing
Supervision of working height, combine space for water tanks washing and monitor the test result from lab
Documented yearly water tank washing activities
Attend to breakdowns, feedback and tenants service call
Supervision of all contractors onsite.
CAD Designer (Piping Department)
Chiyoda and PublicWorks Co.,Ltd
01.2018 - 01.2022
2D, 3D Modeling for (Piping, Equipment and Structure members) as per projects wide create, modify by AutoCAD Plant 3D
2D, 3D models as per need in projects create and modify by AutoCAD
Piping Isometric drawings create and check by AutoCAD Plant 3D
General Arrangement drawings creation and review
Navisworks (nwd/nwc) files creation and review to prevent 50% of the site error.
Pipelines number, model files, piping connections with equipment, piping crack per each area, check and reviews by Navisworks Manage
Piping MTO, Bill of material generates and check by AutoCAD Plant 3D to increase accuracy by 100%.