Aircraft worked on A350 fitted with TRENT XWB-900 & B777 Fitted with GE90 , B787 Fitted with TRENT 1000 RR ,A320 Fitted with IAE V2500
1- Carried out removal & installation of IP check valve of A350
2- Carried out removal & installation of starter of A350
3- Carried out removal & installation of EDP of A350
4- Carried out V2500 engine replacement of A320
5- Carried out servicing of flight controls of A350
6- Carried out removal & installation of fan cowl A350
7- Carried out free play check of flight controls A350
8- Carried out wheel & brake change of A350 & B777
9- Carried out wind shield replacement of B777
10 - Carried out removal & installation of bleed valve controller of A350
11- Carried out removal & installation of TR Actuator of A350
12- Carried out removal & installation of VFG of A350
13- Carried out removal & installation of compressor fairing for inspection A350
14- performed jacking of A350