Principal Engineer- Instrumentation

Wood
05.2012 - Current
  • Company Overview: Client: Shell Chemicals Seraya Pte Ltd /Shell Bukom
  • Leading the time consists of 8 team members (4 Engineer & 4 designers)
  • Responsible for the complete project life cycle starting from FEED phase, Engineering and construction phase.
  • Client: Shell Chemicals Seraya Pte Ltd /Shell Bukom

Senior Instrumentation Engineer

Chevron Oronite Pte Ltd
06.2014 - 04.2016
  • Company Overview: Client: Chevron Oronite Pte Ltd, Jurong Island
  • Involved in complete SIS Safety life cycle activities
  • Participation in HAZOP study.
  • Performed hands-on verification using exSILentia software
  • Extension of SIS engineering performed in Singapore Expansion project & Implementation
  • Preparation of Safety Requirement specification & safety datasheets
  • Preparation of management of functional safety plan for detailed engineering phase & operation/maintenance phase
  • Field Instruments selection & Installation
  • DCS, Fire & Gas Engineering
  • Attended FAT/I-FAT/ SAT for three major systems (Honeywell Experion DCS/ Triconex Tricon SIS , General Monitor Supplied Fire & Gas System with Allenbradley PLC)
  • Training to junior and senior engineers those who are involved in safety life cycle activities
  • Site Support for E&I contractors for execution phase
  • Electrical discipline interface and coordination
  • Client: Chevron Oronite Pte Ltd, Jurong Island

Senior Instrumentation Engineer

Chevron Oronite Pte Ltd
05.2012 - 05.2014
  • Company Overview: Client: Chevron Oronite Pte Ltd, Jurong Island
  • Preparation of Safety Requirement specification/SRS datasheets and SIS Engineering
  • Participation in PHA/LOPA study.
  • SIL verification
  • Preparation of SIS Basis of Design Document
  • Preparation of Process Control and Field Instruments Specifications
  • Engineering coordination & approval of vendor documents for DCS/Safety Instrumented Systems/Fire & Gas System
  • SIL verification
  • 2 months support for Operation & Maintenance phase
  • Electrical discipline interface and coordination
  • Site Support for E&I contractor for execution phase
  • Client: Chevron Oronite Pte Ltd, Jurong Island

Senior Engineer -Instrumentation

Worleyparsons-Arabian Industries JV
09.2007 - 07.2011
  • Company Overview: Client: Sohar Aluminium Smelter/OGC Oman
  • Engineering of Honeywell DCS/HIMA IPS.
  • Preparation of Material Requisition for procurement of Items
  • Coordination with 8 Consumers for Interface requirements
  • Deputed to Honeywell Muscat for FAT of complete control system
  • HAZOP study and SIL Meetings participation
  • Client: Sohar Aluminium Smelter/OGC Oman

Instrumentation Engineer-Maintenance/Projects

Bidco Oil Refinery Limited
12.2004 - 08.2007
  • Worked in Engineering department for 3 years for construction of new refinery facility
  • Involved in Design Related Activities & post preventive maintenance/ modification works
  • Coordinating & Handling of Contractors & Review of Vendor documents
  • Involved in FAT(Factory acceptance test) and also involve SAT(Site acceptance test)
  • Package Specifications review and incorporating the comments
  • Review of Specifications of PLC based control system
  • Weigh Bridge System for loading and unloading measurement using load cells.

Engineer-Instrumentation

L&T Limited
05.2004 - 08.2004
  • Company Overview: Client - Songo Songo gas company
  • Asbuilt drawing preparation for the additional scope of work
  • Clarification of Technical queries of Site personnels
  • Coordinated with vendors (Package vendor, control system vendor) for the review of the documents
  • Deputed to client office for carrying out design review meetings with vendor and client.
  • Verification of Complete I/Os as per the design document and IO list
  • Offshore field instrumentation design works
  • Involved in Precommissioning of Control System Delta V DCS
  • Participated in the Site Acceptance Test and cleared all the punch list in the FAT stage
  • Client - Songo Songo gas company

Project Engineer-Instrumentation

M/s.Aarkay Instruments Pte Ltd
04.2002 - 05.2004
  • BOQ/MTO Preparation for field installation materials
  • Field Instrumentation Engineering & Selection as per the client requirement
  • Involved in FAT & SAT for DCS system
  • Loop checking and commissioning activity
  • Preparation of Loop Test Packs
  • Witness Bench Calibration & Field Calibration of Instruments (Process & Fire /Gas Instruments)
  • Coordinator between GESCO & ONGC

Timeline

Senior Instrumentation Engineer

Chevron Oronite Pte Ltd
06.2014 - 04.2016

Principal Engineer- Instrumentation

Wood
05.2012 - Current

Senior Instrumentation Engineer

Chevron Oronite Pte Ltd
05.2012 - 05.2014

Senior Engineer -Instrumentation

Worleyparsons-Arabian Industries JV
09.2007 - 07.2011

Instrumentation Engineer-Maintenance/Projects

Bidco Oil Refinery Limited
12.2004 - 08.2007

Engineer-Instrumentation

L&T Limited
05.2004 - 08.2004

Project Engineer-Instrumentation

M/s.Aarkay Instruments Pte Ltd
04.2002 - 05.2004
George Samuel