1.Supervised Technical Officers during unit control panel operations and takes steps to correct parameters deviations.
2.Responsible for the safe and efficient
operation of the Boiler-Turbine-Generator units and their auxiliary plants.
3.Guide and train Technical Officers.
.
Propare commissioning procedures; perform test run of auxilary equipment; perform line up of system or part of the system to be commissloned; troubleshoot process problems; arrange for PTR (Permit To Run), and PTW
(Permit To Work): perform maintenance works; duty as operafion shift superyisor during warranty period of 2 x 600MW power plant including auxiliaries and balance of plant.
.
1.Prepare commlssioning procedures: perform test run of auxiary equipment; confirmation of the interlocks in thermal power plant and combined cycle power plant.
2. Project supervision of equipment and piping for power plant and petrochemical plant.
Prepare commissioning procedures, perform test run of auxililary equipment; perform line up of systemn or part of the system to be commissioned; troubleshoot process problems; issue/cancel PTW; perform isolations; consolidate test report; duty as shift engineer during night time plant operation; duty as warranty engineer in Dubai Electricity and Desalination Station D and E.
1.In charge for the operation of the textile plant utilities: steam boiler, auxiliary boiler, steam turbine generator and auxililaries, instrument and service air system, water systern, HVAC system.
2. Perform energy conservation project studies
Extensive experience in mechanical and process commissioning, operation and technical problem solving