Summary
Overview
Education
Work History
Skills
Certification
Work Availability
Accomplishments
Work Preference
Quote
Software
Languages
Interests
Timeline
Hi, I’m

Dinesh Kanagaraj

Project Engineer
Woodlands,Singapore
Dinesh Kanagaraj

Summary

Proficient Project Engineer with over 8 years of experience in Piping installation

(Gas, Waste Water, Drain,Chemical,Exhaust,PCW,UPW) driving over 10 projects to completion. Skilled in overseeing technical staff and checking that projects are completed on schedule, within budget, and according to specifications. Detail-oriented, organized, and meticulous employee. Works at fast pace to meet tight deadlines. Enthusiastic team player ready to contribute to company success.

Overview

12
years of professional experience
4
years of post-secondary education
3
Certificates

Education

ANNA UNIVERSITY
Tiruchirappalli

Bachelor of Engineering from Mechanical
06.2008 - 06.2012

University Overview

Work History

Microfab Engg Pte Ltd
Woodlands, Singapore

Project Engineer
03.2016 - Current

Job overview

Role:

Planning of Job schedule, Manpower and Tools Allocation, Maintain Progress, Resolving Issues, Cost Control.

Responsibilities

  • Assisting Project Manager in Preparation and Submission of Tender for New Projects.
  • Preparation and Submission of all relevant documents for the Project as per client Requirements after the detailed review of Project Plan, design and specifications.
  • Preparing the Materials BOQ based on Client drawing and after the site walk.
  • Raising the PR to Purchaser Once Got approval of Required Materials Brand after submitting Catalogue and Technical Specifications to the Client.
  • Reviewing the Project schedule and commitments made based on Materials lead delivery time
  • Closely Monitor the Progress of schedule, Immediate action to be taken to meet the schedule
  • Eradication of all the factors that affects the Project schedule such as Material delivery delay, Manpower shortage, Mechanical tools and equipment’s shortage, Welding Machines Malfunction etc.
  • Attending Review meeting with client frequently and immediate response to any complaints.
  • Maintaining daily report, Weekly report, Monthly report, Final completion report ,Project costing.
  • Submission of Isometric drawings –Manual hand sketch or CAD as per clients requirement.
  • Responsible for the Claim submission after installation, Testing and line walk done.
  • Submission of Proposal drawing for the additional jobs to get approval.

Project’s Handled :

  • Hivac Hook Up (Micron Fab 10X) (April 2016-Feb 2017)
  • SESVENNA Hook Up (Heptagon-Seagate, Ang Mo Kio) (Feb 2017- Oct 2017)
  • AMS Sensor Solutions (Tampines) (Nov 2017-Feb 2019)
  • Siltronic Silicon Wafer fab (Tampines) (April 2018-Feb 2019)
  • Basebuild (Micron Fab 10N/X) (Mar 2019-April 2021)
  • Hivac/UPW Hook Up(Micron Fab 10N/X) (Jan 2020-April 2021)
  • Drain Hook Up-HK-23 (Micron Fab 10A1) (April 2021-Nov 2022)
  • Drain Basebuild (F-25A) (Micron Fab 10A1/A2) (Nov 2022-May 2022)
  • Drain Hook Up Under KPT (GF-Marsiling)(May 2022-March 2023)
  • WWT Piping Under TOPCO Science (S) Pte Ltd (Sep 2023-Till date)

The Acetech Machinery Components Pvt Ltd
Chennai, Tamilnadu

Planning Engineer
Oct.2013 - Feb.2016 (2 years & 4 months)

Job overview

Role: Planning daily load schedule, Work Order Management, Customer Support, Cost Monitoring

Responsibilities:
 Collecting the drawings for Cutting process from CAD department.
 Colleting the nesting diagram for the relevant drawing from production department.
 Preparing the work order by referring both nesting diagram and CAD drawings.
 Preparation of work order is done by mentioning Material Specification, Processing time, Raw Material Location, Delivery date etc.
 Inspecting the first part whether it has taken as per allotted time indicated on the BOM.
 Monitoring the work throughout to get it completed within delivery time.
 Necessary step are to be taken to get the work order completed as per delivery schedule.
 Reporting the status to the customer and answering to the customer enquiry.
 Closing and Filing the work order after completion.
 Preparing the costing report, comparing the cost effectiveness and reporting to the Admin.
Achievements:
 Reduced the pending of work Order by proper and consecutive monitoring.
 Time Study has been made to complete the work order within the scheduled time.
 Achieved On Time Delivery target of 95% through work order management.
 Achieved Customer Satisfaction by On Time Delivery and Scheduling.

NVH India Autoparts Pvt Ltd
Chennai, Tamilnadu

Graduate Engineer Trainee
09.2012 - 08.2013

Job overview

Role: Line In charge Of Sun Visor Assembly Line.

Responsibilities:
 Ensuring 3C & 5S principles following on the assembly line.
 Manpower allocation and allotment of work to labors.
 Material management as per the required plan.
 Ensuring immediate recovery over any fault occurring on the line.
 Stock management of the finished goods and feeding the stock records to the system.
 Communicating with our department at all sorts of work.
 Maintaining hourly production sheets at the end of the shift.
 Handling of rework jobs within the end of the shift.
 Segregating all the rejection jobs for further reference.
Achievements:
 Reduced the rejection jobs frequency by further study over jobs.
 Made detailed view to increase UPH through line balancing process.
 Reduced the breakdown of machines by maintaining daily maintenance check sheet.
 Maintained the stock in customer end to regulate line shortage and line stop.

Skills

AutoCAD proficiency

undefined

Certification

Advanced Certificate in Workplace Safety and Health

Availability
See my work availability
Not Available
Available
monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Accomplishments

Accomplishments
  • Supervised team of 15 staff members.
  • Achieved Target by completing with accuracy and efficiency.
  • Collaborated with team of 10 in the development of Piping Installation Projects.
  • Used Autocad to develop ISO Drawings for Pipe Fabrication and installation

Work Preference

Work Type

Full Time

Work Location

On-SiteRemoteHybrid

Important To Me

Career advancementCompany CultureFlexible work hoursTeam Building / Company Retreats

Quote

Everything should be as simple as it is, but not simpler.
Albert Einstein

Software

Autocad

MS Office

Languages

English
Intermediate (B1)

Interests

Learning new software's

Timeline

Advanced Certificate in Workplace Safety and Health

05-2022

Managing Work at Height

09-2021

Supervise Construction Work for WSH

09-2019
Project Engineer
Microfab Engg Pte Ltd
03.2016 - Current
Planning Engineer
The Acetech Machinery Components Pvt Ltd
Oct.2013 - Feb.2016 (2 years & 4 months)
Graduate Engineer Trainee
NVH India Autoparts Pvt Ltd
09.2012 - 08.2013
ANNA UNIVERSITY
Bachelor of Engineering from Mechanical
06.2008 - 06.2012
Dinesh KanagarajProject Engineer