Autocad

Proficient Project Engineer with over 8 years of experience in Piping installation
(Gas, Waste Water, Drain,Chemical,Exhaust,PCW,UPW) driving over 10 projects to completion. Skilled in overseeing technical staff and checking that projects are completed on schedule, within budget, and according to specifications. Detail-oriented, organized, and meticulous employee. Works at fast pace to meet tight deadlines. Enthusiastic team player ready to contribute to company success.
Role:
Planning of Job schedule, Manpower and Tools Allocation, Maintain Progress, Resolving Issues, Cost Control.
Responsibilities
Project’s Handled :
Role: Planning daily load schedule, Work Order Management, Customer Support, Cost Monitoring
Responsibilities:
Collecting the drawings for Cutting process from CAD department.
Colleting the nesting diagram for the relevant drawing from production department.
Preparing the work order by referring both nesting diagram and CAD drawings.
Preparation of work order is done by mentioning Material Specification, Processing time, Raw Material Location, Delivery date etc.
Inspecting the first part whether it has taken as per allotted time indicated on the BOM.
Monitoring the work throughout to get it completed within delivery time.
Necessary step are to be taken to get the work order completed as per delivery schedule.
Reporting the status to the customer and answering to the customer enquiry.
Closing and Filing the work order after completion.
Preparing the costing report, comparing the cost effectiveness and reporting to the Admin.
Achievements:
Reduced the pending of work Order by proper and consecutive monitoring.
Time Study has been made to complete the work order within the scheduled time.
Achieved On Time Delivery target of 95% through work order management.
Achieved Customer Satisfaction by On Time Delivery and Scheduling.
Role: Line In charge Of Sun Visor Assembly Line.
Responsibilities:
Ensuring 3C & 5S principles following on the assembly line.
Manpower allocation and allotment of work to labors.
Material management as per the required plan.
Ensuring immediate recovery over any fault occurring on the line.
Stock management of the finished goods and feeding the stock records to the system.
Communicating with our department at all sorts of work.
Maintaining hourly production sheets at the end of the shift.
Handling of rework jobs within the end of the shift.
Segregating all the rejection jobs for further reference.
Achievements:
Reduced the rejection jobs frequency by further study over jobs.
Made detailed view to increase UPH through line balancing process.
Reduced the breakdown of machines by maintaining daily maintenance check sheet.
Maintained the stock in customer end to regulate line shortage and line stop.
AutoCAD proficiency
Mechanical engineering
Schematics understanding
Project management proficiency
Project forecasting
Command, Control, Communications and Computers (C4)
Advanced Certificate in Workplace Safety and Health
Autocad
MS Office
Learning new software's
Advanced Certificate in Workplace Safety and Health
Managing Work at Height
Supervise Construction Work for WSH