Overview
Work History
Timeline
Generic

Chen Fuchun

Overview

15
15
years of professional experience

Work History

Site Reliability Engineer

Cari
09.2024 - Current
  • Improved incident management workflows by creating comprehensive documentation on troubleshooting procedures and common issues resolution steps.
  • Developed custom scripts/tools as needed to automate routine tasks, increasing overall team productivity and efficiency.
  • Conducted root-cause analyses after major incidents to identify areas for process improvement or technical enhancement opportunities.
  • Evaluated new technologies and tools to enhance overall system performance, stability, and security.
  • Contributed to the ongoing refinement of internal processes and procedures within the site reliability engineering discipline through regular reviews, updates, and knowledge sharing activities.
  • Fostered culture of continuous improvement, encouraging team to regularly review and enhance operational procedures.
  • Enhanced system reliability by developing and implementing comprehensive monitoring solutions across all platforms.
  • Conducted comprehensive risk assessments, implementing strategies to mitigate potential threats to system stability.
  • Checked technical designs and drawings for adherence to standards.

Senior Maintenance Planning Engineer

A
05.2021 - 08.2024
  • Assessed the effectiveness of current maintenance strategies, making adjustments as necessary for continuous improvement.
  • Coordinated with external vendors for specialized repairs or services when required, ensuring minimal impact on operations.
  • Analyzed work order data to identify trends and areas for process improvements in the maintenance department.
  • Developed comprehensive maintenance schedules to align with production goals and minimize disruptions.
  • Collaborated with cross-functional teams to ensure seamless communication between departments for optimal workflow.
  • Conducted regular risk assessments in relation to equipment failure and implemented appropriate mitigation measures.
  • Developed customized training programs aimed at enhancing technician skillsets directly contributing to a more efficient maintenance workforce.
  • Improved maintenance processes by developing and implementing strategic plans.
  • Created an effective communication channel between management, engineers, and technicians fostering a collaborative environment that ultimately resulted in improved productivity.
  • Optimized equipment performance through regular inspections and preventive maintenance.
  • Enhanced asset reliability by conducting root cause analysis for recurring issues, implementing corrective actions as needed.
  • Managed a team of technicians, providing guidance and support to ensure adherence to safety standards and protocols.
  • Evaluated spare parts inventory levels, ensuring availability while optimizing costs through strategic procurement practices.
  • Reviewed technical documentation regularly, staying up-to-date on industry best practices and emerging technologies related to maintenance planning engineering.
  • Reduced downtime by proactively identifying potential issues and addressing them in a timely manner.
  • Increased production efficiency by streamlining work order procedures and prioritizing tasks based on urgency.
  • Established and maintained a database of equipment, spare parts, and suppliers to facilitate quicker access to necessary resources during critical repair situations.
  • Implemented predictive maintenance techniques to proactively identify potential failures before they occurred, reducing downtime significantly.
  • Trained staff on proper equipment handling procedures, increasing overall safety awareness within the facility.
  • Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
  • Developed preventive maintenance schedules to minimize downtime and optimize performance.
  • Documented maintenance activities and confirmed compliance with relevant regulations.
  • Visually inspected and tested machinery and equipment, performing routine preventive maintenance.
  • Performed troubleshooting and repair for complex electrical equipment.
  • Reviewed technical documentation to complete equipment maintenance and repair.
  • Organized and directed maintenance shutdowns and startups.
  • Diagnosed and resolved machine operation variations and equipment problems.
  • Investigated and corrected mechanical problems with machinery.
  • Cleaned and lubricated parts to keep equipment operating at peak performance.
  • Resolved customer complaints in prompt, polite and professional approach.
  • Dismantled defective machines and equipment and installed new or repaired parts.
  • Worked frequently with mechanical and plumbing systems to complete knowledgeable inspections and skilled repairs.
  • Organized and updated databases, records and other information resources.
  • Created organized filing system to manage department documents.
  • Identified opportunities to streamline processes and improve office operations and efficiency.
  • Created reports, presentations and other materials for executive staff.
  • Cultivated strong relationships with vendors and partners supporting administrative operations.
  • Coordinated office events, seminars and meetings for staff and clients.
  • Maintained primary relationship accountability for clients, overall servicing responsibility and client satisfaction to maximize profitability of client relationships.
  • Hired, managed, developed and trained staff, established and monitored goals, conducted performance reviews and administered salaries for staff.
  • Oversaw appointment scheduling and itinerary coordination for both clients and personnel.
  • Negotiated and executed contracts on behalf of department.
  • Improved customer satisfaction scores through application of superior conflict resolution and problem-solving skills.
  • Built and managed processes for tracking and monitoring department performance.
  • Completed bi-weekly payroll for [Number] employees.
  • Improved office operations by automating client correspondence, record tracking and data communications.
  • Implemented project management techniques to overcome obstacles and increase team productivity.
  • Managed supervisor itinerary and appointments and streamlined scheduling procedures.

Senior Electrical Engineer

B
01.2016 - 01.2021
  • Identified specific cables, fuses and circuit breakers required for assigned installations.
  • Evaluated electrical installations and systems to isolate faults and implement corrective actions.
  • Supervised construction and pre-commissioning of electrical rooms and substations.
  • Read and analyzed blueprints and project documentation to develop workflows and strategies.
  • Created, aligned, and optimized electrical instrumentation and testing equipment.
  • Reviewed vendor proposals critically for compliance with technical requirements before awarding contracts or purchasing decisions were made.
  • Prepared technical documentation for operation, troubleshooting, and maintenance of industrial systems.
  • Reviewed specifications, drawings, and project manuals.
  • Reduced downtime for critical equipment by performing thorough maintenance and timely repairs.
  • Applied appropriate engineering methods to project discipline standards.
  • Performed maintenance procedures and repairs on existing electrical products and systems.
  • Wrote protocols, qualification documents, test plans and test reports for quality assurance purposes.

Senior Mechanical Engineer

C
01.2010 - 01.2014
  • Collaborated with cross-functional teams to deliver high-quality products on time and within budget constraints.
  • Led the design of new mechanical systems, ensuring adherence to industry standards and regulatory requirements.
  • Completed mechanical designs for HVAC, air control, fire protection, and elevators while providing SME input to client and design teams.
  • Checked design compliance with product specifications and standards requirements.
  • Implemented continuous improvement methodologies to enhance overall team efficiency and productivity levels.
  • Reduced maintenance costs by developing predictive maintenance programs for critical equipment assets.
  • Conducted root cause analyses for recurring issues, leading to long-term solutions that prevented future occurrences.
  • Coordinated with suppliers to ensure timely delivery of materials while maintaining strict quality control measures.
  • Applied mechanical problem solving skills to develop creative solutions for quality products.
  • Troubleshot and diagnosed [Type] equipment issues, quickly made plans for repairs and monitored use to rectify issues.

Timeline

Site Reliability Engineer

Cari
09.2024 - Current

Senior Maintenance Planning Engineer

A
05.2021 - 08.2024

Senior Electrical Engineer

B
01.2016 - 01.2021

Senior Mechanical Engineer

C
01.2010 - 01.2014
Chen Fuchun