
Data Center Commissioning Specialist with 2 years of hands-on experience delivering critical white space cooling infrastructure for high-profile Schneider Electric project sites. Expertly executes comprehensive commissioning workflows across Cx2, Cx3, and Cx4 phases, with specialized technical expertise in validating CRAC, CRAH, Fan Wall, Cool Array, and In-Row units. Deeply familiar with next-generation Liquid Cooling infrastructure validation and managing critical integrated heat load tests using server simulators/load banks. Known for precise deficiency tracking with zero rework, ensuring seamless equipment handover to main contractors.
• Execute data center cooling infrastructure commissioning across Cx2, Cx3, and Cx4 phases for advanced Schneider Electric project sites.
• Perform pre-functional checklists (Cx3) and static testing on Schneider CRAH, CRAC, and Fan Wall units to ensure strict equipment readiness.
• Validate high-density in-row cooling structures, including Cool Array and In-Row cooling systems, for optimal airflow containment.
• Support commissioning validation for next-generation Liquid Cooling infrastructure, ensuring component integrity and structural setup readiness.
• Lead and monitor integrated Heat Load Tests (Cx4) using server simulators/load banks to verify thermal and airflow performance under maximum capacity.
• Manage rigorous commissioning data entry and logs to support seamless project handover to main contractors with zero rework.
• Collaborate closely with Schneider Electric engineers and site M&E teams to align installation verification and streamline handoffs.