Bala Radhakrishnan

Puchong

Summary

Focused Project Manager adept at planning, directing and maintaining continuous operations in various departments. Experienced in directing manufacturing employees and keeping efficient production in accordance with quality standards. Applying creative and analytical approach to operations for continuous process improvement. Skilled at identifying or anticipating problems and providing solutions. Excels through mentoring, training and empowering team to excel in performance.

Overview

16
16
years of professional experience

Work History

ASSISTAN MOD PROJECT MANAGER

OTIS MALAYSIA SDN BHD
06.2016 - Current
  • Responsible for mobilizing & supervising the entire installation process are completed within the time frame without compromising on safety matters and comply with local authorities regulations.
  • To ensure all the safety measures has been factor in before starts the project.
  • To monitor the project budget and ensure the project was completed within the given cost.
  • Draft on the earliest plan on executing the project , to check the projects contracts and generate a plan based on the contract obligation.

•To attend project kick of meeting & project progressive meeting.
•To prepare the necessary documents such as work program , method of statement , safety documents and compile for the site submissions.
•Follow up closely on the equipment delivery with logistic department
•Make sure all the relevant document are well documented such as first schedule application , elevator or escalator layout drawing , copy of contract , purchasing document and invoices.
•Site visit with local contractor for their understanding of the scope of work & site requirement.
•Ensure the relevant approval has obtain and document was submitted at site such as work permit approval , OSH plan & workers list before start the project.
•Ensure the tools used by the contractors are complying with company safety requirement.
• Ensure the work progress at site meet are achieved as per the work schedule.
• Implement installation methods as per company & local authority policies.
• Resource planning & project management planning
• Supervise the contractor & tester work progress at site.
• Ensure that requested resources are available
• Liaise with factory for any additional important information required during the installation or testing work in progress
• To submit request form for local authority inspection.
• To conduct a pre-inspection with testing team and to make sure the installation within local authorities requirement and fit for the DOSH inspection.
• To arrange for the payment JKKP Bill & follow up for the PMA certificate.
•Joint Inspection with the client for the handing over process.
• All those defects which been highlighted by client to be fix/attended accordingly.
• To submit the final claim & follow up on the payment.

Assistant Operation Manager-Service Sales

MS Elevator Engineering Sdn Bhd
11.2012 - 05.2016

A. Administration – Service Sales:

1. Manage & maintain existing clients accounts.
2. To attend on customer inquiries pertaining to contract matters ,quotation , price adjustment, tender submissions & PMA certificate renewal.
3. Direct client to the right channel for any further/additional info especially on the maintenance & finance inquiries.
4. To propose car finishes / Lift interior to existing client.
5. Visit our existing client, to maintain & sustain a good relationship with client which will indirectly helping to secure the business
6. To make sure all the lift maintenance agreement under DLP/Renewable contract was signed back.
7. Attending direct negotiation meeting or tender meeting for government projects
8.To provide training on the department procedure & and company policy to the new employee
9.To assist collection department on collection matters.
10.To assist subordinate on their daily operational works.

B. Field Work – Lift Upgrading Work :-

1.To prepare & plan on the execution of the car finishes/lift interior upgrading work upon the approval of quotation from the sales personnel.
2. Make sure all the drawing & Selection form has been confirm by client before start work. This is to avoid dispute in future.
3. To liaise with contractor , make sure they are clear about the scope of work & to meet the delivery within the time frame given.
4. Monitor the contractors work & make sure their works meet the clients expectation.
5. To have a joint inspection with client , make sure they are satisfied with work & sign the handover letter.
6. To follow up and close all the defect works if there is any.
7. To submit handover report to maintenance department for their reference & submit for billing.

C. Project Management - Modernization

1. To conduct a site survey ( check existing site condition before propose for modernization)
2. To prepare modernization cost estimation for management approval.
3. To prepare modernization proposal
4. Upon the approval , to liaise with drafting department on the revise layout drawing preparing on the sales order as per the proposal.
5. To follow up on the equipment delivery date.
6. Prepare for the 1st schedule application & submit to JKKP for their approval.
7. To arrange for subcontractor for the installation upon the delivery of equipment.
8. Submit work progress report to owner / consultants / main contractors
9. To monitor on the subcontractor & tester works.
10. To arrange for testing & commissioning work once the installation work is completed
11. To conduct a pre-inspection with CP & to rectify any defects before the actual JKKP inspection.
11. Arrange for the JKKP inspection.
12. To have a joint inspection with client , make sure they are satisfied with work & handover letter are signed.
13. Submit the handover letter for billing.

Consumer Lending Specialist

AMBANK (M) BERHAD
09.2008 - 10.2012
  • Well known of Branch Product such as Mortgage, Hire Purchase loan, Personal Financing, & Insurance
  • Attended on Product inquiries & did cross selling or bundle up the product
  • Structured sales plan, processed loan applications, reviewed credit, prepared project papers for developers, monitored loans, and maintained good relationships with customers.

Personal Financial Consultant

HONG LEONG BANK BERHAD
08.2007 - 09.2008
  • Assisted customers regarding financial products, processed loan documents, attended customer inquiries, and assisted in finding solutions for existing customers.

Education

Bachelor's Degree - Business Studies/Administration/Management

MANAGEMENT & SCIENCE UNIVERSITY
Unknown, Malaysia

Higher Secondary/STPM/'A' Level/Pre-U - Arts

Sekolah Menengah Laki-Laki Methodist Kuala Lumpur
Unknown, Malaysia

Skills

  • Microsoft applications
  • TM NIOSH SAFETY TRAINING
  • Project Management
  • Financial Administration
  • Competence Person Training (CP3)
  • Construction Site Supervisor (Mechanical-level 3 , In Lift & Escalator System Installation)
  • Working On Height
  • HIRARC
  • MBOT - Graduate Technologist

Accomplishments

    Project Completion


    1. Menara Maybank - 12 Unit Escalator Modernization)
    2. Park Mall, Suria KLCC - 10 Unit Escalator In Truss. Modernization (First Project In Malaysia).

    3. Ampang Mall & Ramlee Mall, Suria KLCC - 20 Unit Escalator In Truss Modernization).
    4, Nestle Cereal Plant,Shah Alam - 1 unit Service Lift Total Replacement.
    5. DBKL Pedestrian Bridge -1 Unit Escalator (New Installation).
    6. MBPJ Bus Station - 2 units Escalator (New Installation).

    7. Sapura Resources – 8 unit lift total replacement.

    8.Dloft Hotel – 1 unit New Installation).

    9.Maxim Hotel, Genting - 2 unit Escalator Modernization

    10. KL Tower @ Menara Kuala Lumpur -2 Unit Lift Modernization

    11. TNB Bangi - 2 Unit Lift Modernization

    12. UPNM - 4 Unit Lift Modernization

    13. Hotel Malaya - 4 Unit Lift Total Replacement

    14. Bavarian Auto - 1 Unit Total Replacement

    15. CIMB No.34 JTP -1 Unit Total Replacement

    16. Petrosains – 1 unit Hydraulic unit (modernization)

    17. Nestle Chembong - 1 Unit lift Modernization

    18. Bukit Tunku Bungalow - 1 unit Lift New Installation

    19. Menara Indah Condominium - 4 Unit Lift Modernization

    20. Wisma TNB Subang - 4 Unit Lift Modernization

    21. LRT Plaza Rakyat - 2 Unit Escalator Modernization

    22. Texas Instruments Malaysia , Ampang , - 1 Unit Lift Modernization.

Additional Information

  • To use my skills and education to contribute towards developing and expanding the organization performances. To be able to provide ideas, opinions and maintain a positive approach to changes for better outcomes. To be able to provide excellent service and take personal responsibility for getting things right first time., MANAGEMENT & SCIENCE UNIVERSITY,Seksyen 13 Shah Alam July 2004- May 2007 Bachelor of International Business, major in Finance and Banking. INDUSTRIAL TRAINING EXPERIENCE: 1. Asst.Of Revenue Officer, Malaysian Airlines System. April 2007 - Jun 2007
  • Help in doing a business plan and strategies for the entire station.
  • Do the RMP modules for all station.
  • Calculate all the estimated revenue figure of year 2007 for the entire station.
  • Do a backup plan for Kuala Lumpur station. SIGNIFICANT COURSEWORK:
  • Financial Management B
  • Career In Business Management A
  • Transportation and forwarding A-
  • Investment Analysis B-
  • International Financial Management B-
  • Business Mathematics B+
  • Principles and Practices Of Management A
  • Organizational Behaviour B
  • International Business A-
  • Managerial and Cost Accounting B+
  • Money and Capital Market B-
  • Industrial Training A- ACHIEVEMENT IN CAREER
  • Top 10 personal Banker ( 2009) nationwide
  • Top 10 Mortgage Officer (2010) ( Nationwide) qualified to Melbourne trip
  • Top Branch according Branch category on Islamic MORTGAGE challenge 2011 ( Nationwide) ACHIEVEMENT IN UNIVERSITIES.
  • Champion of Intervasities Football Year 2004,2006,&2007.
  • AJK of Arts Club 2005.
  • EXCO of Charity Project 2007.
  • EXCO of Entrepreneurship Project 2006. ACHIEVEMENT IN SCHOOLS.
  • Prefect 2000-2001
  • Class Monitor 1997-1999
  • Represent for School in Handball Competition Of InterZon 1999.
  • Represent for School in Football Competition Of Inter Zon and MSSKL 2003. ADDITIONAL SKILLS:
  • Proficient in Microsoft Office applications
  • Able to work under minimal supervision & complete the task within the time period.
  • Able to demonstrate a pleasant, enthusiastic and helpful manner when dealing with customers and colleagues.
  • Handled all customers/requestors and colleagues enquiries, instructions and complaints promptly, willingly, accurately and efficiently.
  • Able to handle paper works without any confusion or disarray.
  • Good Team Player & able to work under pressure
  • Self motivated and independent.

Languages

English
Bahasa Malaysia
Tamil

Company

OTIS MALAYSIA SDN BHD

Job Title

ASSISTANT MOD PROJECT MANAGER

Timeline

ASSISTAN MOD PROJECT MANAGER

OTIS MALAYSIA SDN BHD
06.2016 - Current

Assistant Operation Manager-Service Sales

MS Elevator Engineering Sdn Bhd
11.2012 - 05.2016

Consumer Lending Specialist

AMBANK (M) BERHAD
09.2008 - 10.2012

Personal Financial Consultant

HONG LEONG BANK BERHAD
08.2007 - 09.2008

Bachelor's Degree - Business Studies/Administration/Management

MANAGEMENT & SCIENCE UNIVERSITY

Higher Secondary/STPM/'A' Level/Pre-U - Arts

Sekolah Menengah Laki-Laki Methodist Kuala Lumpur
Bala Radhakrishnan