Summary
Overview
Work History
Education
Skills
Timeline
Hi, I’m

AUNG NYEIN CHAN

Mechanical Engineer
Singapore
AUNG  NYEIN CHAN

Summary

Energetic Mechanical Engineer enthusiastic about developing deeper understanding of engineering design and leadership. Natural leader and networker with hardworking, resourceful and competitive nature. Four years of experience inPetrochemical manufacturing plants.

Overview

4
years of professional experience
8
years of post-secondary education
2
Languages

Work History

PEC

Shell Jurong Island - Routine Maintenance and C&N
2020.01 - Current (4 years & 8 months)

Job overview

  • Conducted preventive maintenance on equipment.
  • Site check with client engineers and list down bill of materials based on job scope
  • Prepare required documentation such as Method of statement, Total Flange Assurance, Job Hazard Analysis, Ventilation Plan and submit to client for approval.
  • Prepare all necessary Job Hazard Analysis and e-PTW permits of all related job scopes
  • Communicate with third party vendors for required inspections Communicate with other contractors for required activities like scaffolding, insulation, painting and electrical.
  • Plan for manpower, tools & equipment, materials on daily work activity
  • Perform the work safely to get good quality and to finish on time.

PEC

EO Grid Project (Shell Chemical Seraya Pte Ltd )
2022.04 - Current (2 years & 5 months)

Job overview

- Prepare all necessary Job Hazard Analysis for approval and e- PTW permits of all related job scopes

- Communicate with third party vendors for require inspections

- Plan for manpower, tools & equipment, materials on daily work activity

- Report daily work progress and submit to client.

- Monitoring for new piping fabrication and installation on site

- Coordination on hydro testing activity for all the work packs of the project

- Line walk with client for the punch item finding out

- Assigned work crew for punch clearing and preparation for hydro testing activity

PEC

Sterling Project (Shell Chemical Seraya Pte Ltd )
2022.08 - 2023.04 (8 months)

Job overview


  • Prepare all necessary Job Hazard Analysis for approval and e-PTW permits of all related job scopes
  • Communicate with third party vendors for require inspections
  • Plan for manpower, tools & equipment, materials on daily work activity
  • Report daily work progress and submit to client.
  • Monitoring for new piping fabrication and installation on site
  • Line walk with client for the punch item finding out
  • Assigned work crew for punch clearing and preparation for hydro testing activity 
  • Coordinate on painting and insulation after hydro testing

PEC

MEG Turnaround-TA (Shell Chemical Seraya Pte Ltd)
2022.07 - 2022.08 (1 month)

Job overview

  • Participated in team projects, demonstrating ability to work collaboratively and effectively
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Coordinated with client TA planner/engineers/Operations as per TA job scope item
  • Site checked and list down bill of materials for each job scope item.
  • Arranged material and tools.
  • Prepared method statement, Job Hazard Analysis, Total Flange Assurance report and submitted to client for approval.
  • Planned for manpower, tools & equipment, materials for addendum scopes
  • Reported daily work progress and submit to block leaders
  • Prepared all necessary JHA for approval and e-PTW permits of all related job scopes

PEC

Shell Jurong Island S1 Turnaround-TA (2021)
2021.01 - 2021.12 (11 months)

Job overview

  • Managed time efficiently in order to complete all tasks within deadlines.
  • Proven ability to learn quickly and adapt to new situations.
  • Gained strong leadership skills by managing projects from start to finish.
  • Self-motivated, with a strong sense of personal responsibility.
  • Coordinated with client TA planner/engineers/Operations as per TA job scope items
  • Site checked and list down bill of materials for each job scope item
  • Arranged the material and tools
  • Prepared the method statement, Job Hazard Analysis, Total Flange Assurance report and submitted to client for approval.
  • Planned for manpower, tools & equipment, materials for addendum scopes
  • Reported daily work progress and submit to block leaders
  • Prepared all necessary JHA for approval and e-PTW permits of all related job scopes.

PEC

Shell Jurong Island S2 Turnaround-TA (2020)
2020.09 - 2020.12 (3 months)

Job overview


  • Assisted senior supervisor for removal and installation of valves (manual valves, control valve, relief valve, butterfly valve, Check Valve, MOV, ect.)
  • Assisted for preparing of documents such as e-PTW, Method Statement and Total Flange Assurance
  • Assisted for mobilization and demobilization of tools and materials
  • Assisted for preparing of Manual Rigging Plans
  • Reported daily work progress and submit to block leader

Education

MONYWA Technological University Myanmar

Bachelor Engineering from Mechanical Engineering
2011.01 - 2018.12 (7 years & 11 months)

University Overview

Skills

     Microsoft Office

undefined

Timeline

Sterling Project (Shell Chemical Seraya Pte Ltd )
PEC
2022.08 - 2023.04 (8 months)
MEG Turnaround-TA (Shell Chemical Seraya Pte Ltd)
PEC
2022.07 - 2022.08 (1 month)
EO Grid Project (Shell Chemical Seraya Pte Ltd )
PEC
2022.04 - Current (2 years & 5 months)
Shell Jurong Island S1 Turnaround-TA (2021)
PEC
2021.01 - 2021.12 (11 months)
Shell Jurong Island S2 Turnaround-TA (2020)
PEC
2020.09 - 2020.12 (3 months)
Shell Jurong Island - Routine Maintenance and C&N
PEC
2020.01 - Current (4 years & 8 months)
MONYWA Technological University
Bachelor Engineering from Mechanical Engineering
2011.01 - 2018.12 (7 years & 11 months)
AUNG NYEIN CHANMechanical Engineer