Accomplished engineering and construction professional with 23 years of experience in commissioning and project management within shipyard FPSO and onshore activities. Expertise includes overseeing pre-commissioning and commissioning of marine and topside process systems, ensuring safety, regulatory compliance, and effective collaboration across multidisciplinary teams. Seeking to leverage extensive technical background in a Commissioning Engineer role.

Work History

Commissioning Engineer

4 Months
Wilsafe System Pte Ltd | 06.2026 - 10.2026
  • Coordinated commissioning and testing activities for CO2 and water mist firefighting systems on Petrobras P-82 FPSO, ensuring compliance with approved procedures, drawings, and specifications.
  • Conducted inspections, system walk downs, and functional checks; documented findings and tracked outstanding items to closure, ensuring all issues were resolved promptly.
  • Review relevant technical documents such as P&ID drawings, commissioning test procedures before work execution.
  • Review relevant technical documents such as P&ID drawings, commissioning test procedure before work execution.
  • Supported safe work execution through permit-to-work requirements, risk assessments, isolations and site safety controls.
  • Prepare and maintain accurate test records, check sheets, punch lists, reports and handover documentation.
  • Achievement: Challenge is those tubing connections are leaksing and have to resolve to get zero leak as client and class requirements. Client is happy and accepted of CO2 system actual release test and water mist system.

Completion Coordinator

1 Year
Tuff Engineering | 04.2025 - 04.2026
  • Achievement: Completed all mechanical completion documents on time and final completion dossier are fully completed and submitted to client after 4weeks of vessel delivered.
  • Collaborated with supervisors, contractors, and technical teams to resolve site constraints, equipment issues, and work interfaces, ensuring project timelines were met.
  • Conducted inspections, testing, and defect rectification activities.
  • Collaborated with construction and installation team to ensure project alignment. to ensure mechanical completion and readiness of assigned equipment and system.
  • Attended site coordination meetings to discuss project progress and challenges., technical discussions, commissioning progress reviews and customer inspection.
  • Supported or coordinated engineering, construction and delivery manager and project manager in line with approved drawings, specifications and work procedures.
  • Managed punch list preparation, maintenance, and follow-up to facilitate timely rectification and closure of outstanding issues before system completion.
  • Achievement: Completed all mechanical completion documents on time and final completion dossier is fully completed and submitted to client after 4 weeks of vessel delivered.

Construction Manager

1 Year 6 Months
Odesa Marine Ventures | 10.2023 - 04.2025
  • Assigned as construction manager for new build Vapor Recovery Unit (VRU) module 2 units for Modec’s FPSO Uaru and Raia.
  • Manages the implementation of workplace safety and health (WSH) frameworks by ensuring compliance with WSH act
  • Conduct regular safety inspection and coordinate with stakeholders to address safety concerns effectively.
  • Ensure that the project is carried out in accordance with approved plan/drawings, contract specification and regulations.
  • Ensure that the project is carried out in accordance with approved plan/drawings, contract specifications and regulations.
  • Attend project meetings, technical meetings to resolve issues with client’s representatives, consultants and subcontractors.
  • Daily monitor and review project schedule and weekly look ahead plan to meet the project schedule timeline.
  • Communicate with the engineering team to give feedback and resolve construction issues.
  • Completed mechanical work as per project specifications and timelines. mechanical completion and preservation as project specifications on time.

Assistant Project Manager & Commissioning Manager

12 Years 3 Months
Keppel Shipyard Ltd & Seatrium O&G (Americas) Ltd | 07.2011 - 10.2023
  • Day-to-day planning of work, manage schedule and targets of project requirements.
  • Conducted quality control of work related to budget, schedule, plans, and personnel performance, providing regular project status reports to stakeholders.
  • Perform overall quality control of the work (budget, schedule, plans, and personnel’s performance) and report regularly on project status.
  • Patrolled work areas daily to ensure safety compliance and address any violations promptly.
  • Liaising and coordinating with all parties involved in the projects such as consultants, main contractors, sub-contractors, suppliers, local authorities, environmental agencies and federal entities etc. to ensure successful implementation of the project.
  • Developed commissioning test procedures (CTP) for marine systems, including seawater service/cooling, freshwater cooling, HVAC, diesel transfer and purification, and hot and cold water systems.
  • Tracking and monitoring the project progress through progress reports prepared by the completion team members against the project team’s requirements to anticipate changes in planned manpower loading and where necessary requests for manpower adjustment in a timely manner.
  • Reviewed project documentation for accuracy, completeness, and compliance with internal standards.
  • Facilitated meetings, captured action items, and tracked follow-up tasks through completion.
  • Supported risk identification and issue resolution to minimize schedule disruptions.
  • Assisted in the successful completion of projects by coordinating tasks, monitoring progress, and maintaining documentation.

Commissioning Engineer

9 Years 5 Months
Keppel Shipyard Ltd | 02.2002 - 07.2011
  • Establish and ensure effective management of the system handover process from MC to testing and operation. Verify drawings and documents required for testing and commissioning.
  • Plan manpower and communicate commissioning plan to engineers and technicians in accordance with overall project plan. Prepare and update commissioning progress plan and brief commissioning manager on overall progress.
  • Planned manpower and communicated commissioning plan to engineers and technicians, aligning with overall project timeline and updating commissioning progress plan for commissioning manager.
  • Liaise with completion & QAQC team, owner representatives and operations team on site issues, preservation and handover of systems.
  • Review vendor and commissioning documents and engineering drawings. Raise purchase requisitions for materials, tools and consumables.
  • Signed off commissioning test plans for work packs. Monitor sign off and clear commissioning vendor punch list.
  • Participate in project kick-off, progress meeting, risk assessments and HAZOP exercise.
  • Prepared and submitted commissioning documents to facilitate effective project execution.
  • Performed integrated testing, troubleshooting, and defect resolution across installed equipment and controls.
  • Coordinated with project teams, vendors, and clients to align commissioning schedules and requirements.
  • Verified compliance with safety codes, regulatory standards, and project documentation before final acceptance.
  • Prepared commissioning reports, test records, and handover documentation for project closeout.

Education

Diploma - Mechanical Engineering

Ngee Ann Polytechnic | Singapore | 06-2007

Mechanical Power - Mechanical Engineering

Technical High School No. (1) | Yangon, Myanmar | 11-1998

Skills

Commissioning planning
Functional testing
Punch listing
P&ID and drawing review
Installation inspection
Troubleshooting coordination
HSE compliance
Project coordination
Commissioning documentation
Discipline knowledge
Project management software
Documentation management

Languages

Languages: English – Professional Working
B2
Upper intermediate

Certification

  • Safety Instruction Course for Ship Repair Managers – Vision Global, Mar 2020, Singapore.
  • Data Analytics Begin with me – National University of Singapore, Nov 2019, Singapore.
  • Marine Supervisor Course – PSB, Jul 2010, Singapore.
  • Risk Management Course – Team-6 Safety & Consultancy (S) Pte Ltd, Aug 2009, Singapore.
  • Marine Project Management for Supervisor – Ngee Ann Polytechnic, Oct 2006, Singapore.

Personal Information

Aung Hlaing Myint

Commissioning Lead Engineer

Singapore

Timeline

Commissioning Engineer

Wilsafe System Pte Ltd
06.2026 - 10.2026Read More

Completion Coordinator

Tuff Engineering
04.2025 - 04.2026Read More

Construction Manager

Odesa Marine Ventures
10.2023 - 04.2025Read More

Assistant Project Manager & Commissioning Manager

Keppel Shipyard Ltd & Seatrium O&G (Americas) Ltd
07.2011 - 10.2023Read More

Commissioning Engineer

Keppel Shipyard Ltd
02.2002 - 07.2011Read More

Technical High School No. (1)

Mechanical Power from Mechanical Engineering
Read More

Ngee Ann Polytechnic

Diploma from Mechanical Engineering
Read More
AUNG HLAING MYINT