Summary
Overview
Work History
Education
Skills
Timeline
Generic

Asba Madzidah Abu Bakar

Staff, Well Completion

Summary

Technical Professional and Assurer for well completion design selection and optimization in accordance to PETRONAS Technical Standard (PTS) and American Petroleum Institute (API) Standard for all types of wells (oil producer, gas producer, gas injector and water injector) focusing on specific well requirement such as:

  • Normal pressure & normal temperature well (NPNT)
  • High pressure & high temperature well (HPHT)
  • Intelligent completion (IC)
  • Active sand control methodology (downhole sand control)

Overview

13
13
years of professional experience
4
4
years of post-secondary education

Work History

Staff, Well Completion

PETRONAS
07.2021 - Current
  • Proactively identified potential risks associated with proposed completion designs, developing mitigation strategies accordingly.
  • Provided technical expertise during completion conceptual design, detail design, project planning and execution phase.
  • Participated actively in professional organizations'' events focused on sharing knowledge related to well completions, staying abreast of industry trends and best practices.
  • Evaluated new technologies for applicability in improving overall completion performance and cost effectiveness.
  • Team Lead for completion related tendering exercise.
  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components, and systems.
  • Provided input to team lead regarding areas for process and procedural improvement.
  • Trained and mentored competent and flexible workforce to meet project needs and promote positive work environment.

Senior Completion Engineer

PETRONAS
05.2016 - 07.2021
  • Proactively identified potential risks associated with proposed completion designs, developing mitigation strategies accordingly.
  • Managed multiple task simultaneously, prioritizing tasks effectively to meet deadlines without compromising quality or safety standards.
  • Reduced project costs with careful planning and execution of completion operations.
  • Improved well completion efficiency by designing and implementing optimized drilling and completion strategies.
  • Optimized production rates, employing advanced completion techniques tailored to specific reservoir conditions.
  • Mentored and supervised interns and junior engineers, fostering their professional growth by sharing valuable knowledge and practical tips.
  • Streamlined field operations through effective communication between Wells, Facilities, Operation team members and on-site personnel.
  • Ensured safety compliance during all stages of the completion process, minimizing risk exposure for both personnel and equipment.
  • Collaborated with multidisciplinary teams to develop integrated solutions for complex completion design and challenges.
  • Conducted detailed After Action Review analyses of completed wells to identify areas for improvement in future operations.
  • Developed cost estimates and project specifications for proposals.

Completion Enginner

PETRONAS
01.2011 - 05.2016
  • Reduced project costs with careful planning and execution of completion operations.
  • Ensured safety compliance during all stages of the completion process, minimizing risk exposure for both personnel and equipment.
  • Developed comprehensive workover plans in collaboration with Production Technologist to deliver well objective and target production rate.
  • Collaborated with multidisciplinary teams to develop integrated solutions for complex wellbore challenges.
  • Effectively coordinated logistics for materials movement related to completion projects, eliminating unnecessary delays in implementation.
  • Implemented novel stimulation techniques to maximize hydrocarbon flow from tight reservoirs while maintaining environmental integrity.
  • Interfaced regularly with regulatory bodies, ensuring timely submission of required permits and documentation pertaining to well completions activities.

Education

Bachelor - Mechanical Engineering

Universiti Tecknologi PETRONAS, UTP
Perak, Malaysia
07.2006 - 10.2010

Skills

Team Management

undefined

Timeline

Staff, Well Completion

PETRONAS
07.2021 - Current

Senior Completion Engineer

PETRONAS
05.2016 - 07.2021

Completion Enginner

PETRONAS
01.2011 - 05.2016

Bachelor - Mechanical Engineering

Universiti Tecknologi PETRONAS, UTP
07.2006 - 10.2010
Asba Madzidah Abu BakarStaff, Well Completion