QE LNG 3 & 4 DCS Upgrade (Qatar) (Apr 2025):
- Worked as Hardware engineer for QG-3 & 4 plant shutdown activities which included:
- Power & grounding recommendations
- Serial Card TB verification for Controller & IO card flashing
- Hardware SAT
- Network switches firmware upgrade
Thermal Testing Facility. (Qatar) (March 2025):
- Worked as Hardware engineer for DeltaV System/Marshalling cabinets which includes documents such as:
- IO assignment update
- Console GA & Wiring drawing
- And Pre-FAT for south region cabinets that include tests such as:
- Hardware visual & BOM checks
- Power & grounding check
Sapele LPG Propane Storage and Offloading Facility. (Nigeria) (March 2025):
- Worked as Hardware engineer for DeltaV System/Marshalling cabinets & SJJB Pre-FAT that include tests such as:
- Hardware visual & BOM checks
- Power & grounding check
- IO testing
- Diagnostics & redundancy checks
PDO Habr RMS (Oman) (Jan 2025 – Feb 2025):
- Worked as Hardware engineer for As-built documentation
- QE LNG 2 DCS Upgrade (Qatar) (Oct 2024 – Nov 2024):
- Worked as Hardware engineer for QG-2 plant shutdown activities which included:
- Power & grounding recommendations
- Serial Card TB verification for Controller & IO card flashing
- Hardware SAT
- Network switches firmware upgrade
PDO Habr Wellhead. (Oman) (Sep 2024 - Apr 2025):
- Working as Hardware engineer on DeltaV CIOC/CSLS CHARMS System/Marshalling cabinet & its documents such as:
- GA and Wiring drawings typical
- IO Assignment
- Cable schedule
- System Architecture
- FDS – DCS & SIS
- Heat & power calculation
Tinrhert Gas Development. (Algeria) (Apr 2024 to Aug 2024):
- Worked as Hardware engineer for DeltaV CIOC/CSLS CHARMS cabinets Pre-FAT & FAT that include test such as:
- Hardware visual & BOM checks
- Power & grounding check
- IO testing
- Diagnostics & redundancy checks
- Punch points closure
QChem & NAO Tank Farm Projects. (Qatar) (Feb 2024 - May 2024):
- Worked on modification of existing ICSS DeltaV M-series traditional IOs cabinets.
- Checking adequacy for DeltaV Network switches and DeltaV EIOC device.
- Worked on network cable schedule.
- Updated IO allocation as per revised IO list.
- Heat power calculation for RIE DCS cabinet.
Ras Laffan Petroleum & Pipeline Projects. (Qatar) (Jan 2024 - Mar 2024):
- Worked as an Interface engineer support for Polyethylene and Ethylene area REIs.
- Verify and review third-party interface documents.
- Co-ordinating with third-party vendor L&T for document update
- Worked on FOPP cable schedule documents for Ethylene and Polyethylene areas.
- Altona-Yarraville. (Australia) (Oct 2023 to February 2024):
- Worked as Hardware engineer on DeltaV CHARMS System cabinet and Server cabinet & its document such as:
- GA and Wiring drawings
- Heat & power calculations
- System Architecture
British Petroleum Programme. (Iraq) (Jul 2023 - Jan 2024):
- Worked as Hardware integration engineer (HIE) for BP DS Flare 02/03/04, BP DOG 07/08/09, KM400, KM500 and Qarmat Ali.
- Project kick-off meeting with project team
- BOM preparation w.r.t cabinet drawings.
- Tracking project material in coordination with procurement team.
- Periodically updating project team regarding project status
- Provide necessary inputs to production team and overseeing cabinet integration.
- Delivering cabinets with proper dispatch
Abu Qir Petroleum. (Egypt) (July 2023):
- Worked as Hardware engineer for DeltaV SLS1508 System/Marshalling cabinets Pre-FAT that include tests such as:
- Hardware visual & BOM checks
- Power & grounding check
- IO testing
- Diagnostics & redundancy checks
- Punch points closure
KOC/JPFS. (Kuwait) (June 2023):
- Worked as Hardware engineer for DeltaV CIOC/CSLS CHARMS cabinets Pre-FAT that include test such as:
- Hardware visual & BOM checks
- Power & grounding check
CO2 Capture Device. (Japan) (June 2023):
- Involved in cabinet design which included tentative HPC, BOM, GA drawing generation for proposal.
- Project Experience in Schneider Electric (Jul’22 – Feb’23):
Effluent Treatment Plant Paramount India Limited (Vadodara, GJ) (Aug 2022 - Feb 2023):
- In this project, engineering, and installation of Modicon M580 PAC control panels at site. Was responsible for below activities:
- Hardware drawing generation.
- IO assignment
- Iogs mapping in software.
- SCADA screens modification.
- Project Experience in Sikraft Infotech (Oct’18 – Jun’22):
Eneco WaWa Power Plant. Nuon Power Generation BV (Netherlands) (5 months):
- Modernization of existing ABB P14 control system to Siemens SPPA-T3000 DCS. Was responsible for below activities:
- Preparation of HMI standards.
- Implementation of HMI displays w.r.t reference pictures and P&ID.
- Quality checks of implemented HMI displays.
- Cabinet and loop drawings generation
Goldenberg-werk Power Plant. RWE Power AG (Germany) (9 months):
- Modernization of existing Siemens Teleperm M control system to Siemens SPPA-T3000 DCS. Was responsible for below activities:
- Hardware typical identification.
- Channel assignment.
- Spare calculation
- Cabinet and loop drawings generation
- Quality checks for hardware drawings
- Report generation.
- After commissioning activities redlines implementation
Jeju PG (South Korea). Korea Midland Power Co. (5 months):
- Upgradation of existing Siemens PCST system to Siemens SPPA-T3000 DCS. Was responsible for below activities:
- Preparation of HMI standards.
- Implementation of HMI displays w.r.t reference pictures and P&ID.
- Quality checks of implemented HMI displays.
- Analysis of PCST software plans and comparing with available standard library.
- Conversion and modification of old logic into SPPA-T3000 with old functionality intact.
- Quality checks of software plans.
Al-Taweelah A1 Power and Desalination Plant. Gulf Total Tractebel Power Company (UAE) (1.5 years):
- Modernization & Migration of existing legacy system to Siemens SPPA-T3000 DCS. Was responsible for below activities:
- Preparation of concept documents and engineering standards.
- Creation of IO database
- Hardware typical identification
- Raising LOPs and clarification.
- Channel assignment.
- Spare calculation
- Cabinet and loop drawings generation
- Quality checks for hardware drawings
- Implementation of HMI displays w.r.t P&ID.
- Quality checks of implemented HMI displays.
- Software logic implementation w.r.t SAMA and control philosophy
- Channel assignment.
Bayswater Power Station. AGL Macquarie (Australia) (1 month):
- In this project, engineering of Siemens FUM/SIM cabinets. Was responsible for below activities:
- Modification of hardware drawings
- Quality checks of hardware drawings
- As-built documentation
Jebel Ali G Station. Dubai Electricity & Water Authority (UAE) (3 months):
- Modernization of existing Siemens Teleperm control system to Siemens SPPA-T3000 DCS. Was responsible for below activities:
- Updating IO database
- Creating hierarchy w.r.t folder structure in SPPA-T3000
- Creation and modification of software typical
- Industry Experience
- Powerplant
- Water Treatment
- Oil & Gas
- Overall Experience