Summary
Overview
Work History
Education
Skills
Personal Information
Supplementary Of Competency - Additional Info
References
Certification
Languages
Timeline
background-images
Zafarul Naim Bin Jamaludin

Zafarul Naim Bin Jamaludin

Kuala Terengganu

Summary

Results-driven engineering professional with strong track record in project management and technical expertise. Adept at leading cross-functional teams and delivering projects on time and within budget. Skilled in problem-solving, resource allocation, and stakeholder communication. Known for adaptability and consistent performance in high-pressure environments.

Overview

14
14
years of professional experience
1
1
Certification

Work History

Senior Project Engineer

Petronas Carigali Sdn Bhd
05.2023 - Current
  • EPCC OGT Flare PLC and Monitoring Upgrade for Flare Laut - Jan 2024 to July 2025.
  • Phase 1 Manual Operated EPCC OGT Water Evacuation and Separation Improvement - New piping installation and upgrade for water evacuation from HPL - Jan 2024 - November 2025.
  • Phase 2 Automation EPCC OGT Water Evacuation and Separation Improvement - New piping installation and upgrade for water evacuation from HPL - March 2025 - Ongoing.
  • EPCC OSC CTP Panel Upgrade - Replacement of existing obsolete CTP panel to PLC panel indoor - Jan 2025 - Nov 2025.
  • EPCIC OGT Power Distribution Improvement Phase 3 - August 2025 to Ongoing.
  • EPCC Construction new Transformer Bay/Shelter and TNB Substation Extension for Metering Room.
  • EPCC Coriolis Meter Upgrade at OGT JDS & RDS and OSC - Jan 2025 - November 2025.
  • EPCC OSC Power Rejuvenation (OSCAR) - March 2025 - Ongoing.
  • New Transformer Bay and TNB Substation Extension at OGT Kerteh - September to Ongoing.
  • EPCC System Integration Project - DCS Integration for Metering Upgrade OGT JDS and RDS - September 2025 to Nov 2025.
  • EPCC HMI new Configuration for Metering Upgrade OGT and OSC - September 2025 to Nov 2025.
  • EPCC OGT Flare PLC and Monitoring Upgrade for Flare Bukit - March 2025 - October 2025.
  • Peninsular Malaysia Asset

Project Manager

Borneo Seaoffshore Engineering Sdn Bhd
01.2021 - 04.2023
  • Analyzed project performance metrics to identify areas for improvement and efficiency gains.
  • Led cross-functional teams to ensure project delivery within scope and timeline.
  • Developed comprehensive project plans, defining milestones and resource allocation.
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Planned, designed, and scheduled phases for large projects.
  • Met project deadlines without sacrificing build quality or workplace safety.

Project Manage:

Client: Gas District Cooling (GDC) KLIA, Sepang. Selangor - (February 2021 – March 2021)
-
EPCC HOT SECTION EXCHANGE PROGRAM for Gas Turbine Generator (GTG) LM2500 GT6001B
-
Major inspection Generator Unit GT6001B
Client: Petronas MLNG – Bintulu (May -June 2021)
-
EPCC Pipeline isolation for MOVs changeout using STATS Techno plug during MLNG TA 2021
-
High Pressure High Flow Pumping utilizing nitrogen vaporizer pump unit to propel the Tecno Plug
Client: Gas District Cooling (GDC) KLIA, Sepang. Selangor - (January 2022 – February 2022)
-
EPCC HOT SECTION EXCHANGE PROGRAM for Gas Turbine Generator (GTG) LM2500 GT6001A
-
Major inspection Generator Unit GT6001A
-
Turbine Mid Frame installation
Client: ExxonMobil Exploration & Production Malaysia Inc. - EPCC Pipeline isolation for SDV changeout 16” Tapis – TCOT Site Survey (March 2022)
Client: EPOMS & Vestigo - EPCC Pipeline isolation/positive isolation utilizing mechanical plug for SDV615 changeout 12”
Larut-A To Guntong-D Site Survey and Shutdown July 2022

Senior Project Engineer

Borneo Seaoffshore Engineering Sdn Bhd
01.2017 - 12.2020
  • Facilitated team and sub-contractors' meetings effectively, held regular status meetings with project team and kept project team well informed of changes within the organization.
  • Suggested areas for improvement in internal processes along with possible solutions that happened in site to the Project Manager.
  • Proactively managed changes in project scope, identified potential crises, and devised contingency plans together with Project Manager.
  • Lead during Detail Engineering Design (DED) Stage for Pipeline / Piping scope and Onshore Fabrication at contractor yard.
  • Ensure contractor/vendor develop comprehensive ITR's, Isolation Plans and review all the related documents until AFC.
  • Read and interpret engineering documents such as P&IDs, Isometrics, Piping Layouts, Pipe Support and etc.
  • Review and validate the Contractors Schedule Plans and Master Documents Register List (MDRL), Manpower Loadings, Workpack, Job Method Statement, Materials Take Off (MTO) etc.
  • To ensure mechanical and piping systems are installed correctly as per engineering design and are ready for operation/start up at the end of project.
  • Lead the mechanical/piping commissioning efforts, work with contractor in developing and executing commissioning plans, monitoring test such as leak tests and performance tests, ensuring safety compliance, verifying installations against designs AFC, overseeing punch lists and troubleshooting issues throughout campaign the start-up sequence until back online.

Client: Petronas Carigali Sdn Bhd, PMA
-
EPCC - Pipeline isolation for valves replacement using TDW Smartplug during ANGSI July / Aug TA (19 July – 20 Aug 2017).

32” GUNTONG – ANDR-A pipeline (to replace MOV2921, SDV2923)

32” OSC – ANDR-A pipeline (to replace MOV2904, SDV 2900)

24” SELIGI – ANDR-A pipeline (MOV2930)

Pipeline isolation for valves replacement using TDW Smartplug during Onshore Slug Catcher October TA 2018
-
High Pressure High Flow Pumping utilizing single triplex pumping unit to propel the Smart Plug
28” JERNEH – OSC for valve replacement at onshore slug catcher (OSC) facility on 15th October 2017 – 1st November 2017
Client: Petronas Carigali Sdn Bhd, SKO - Miri
-
EPCC Pipeline isolation for valves replacement using STATS Techno plug and IK High Sealing Pig during Baronia April TA (22 April 2018 – 30 April 2018).
-
High Pressure High Flow Pumping utilizing nitrogen vaporizer pump unit to propel the Tecno Plug

18” PL266 from BNG-B – E11R-A (ABV-9601 to be replaced)

18” PL284 from BNDP-I – BNG-B (ABV-9101 to be replaced)

SDV and MOVs changeout and sectional replacement pipeline
Client: Petronas Carigali Sdn Bhd, SKG - Bintulu

EPCC Pipeline isolation for SDV2917 actuator changeout using STATS Techno plug during M1 August/September TA (30 Aug 2018–13 September 2018).

High Pressure High Flow Pumping utilizing nitrogen vaporizer pump unit to propel the Tecno Plug

30” PL327 from M1DR-A – E11R-C (Actuator for SDV2917 to be replaced)

Client: Bintulu Integrated Facility - Petronas Carigali Sdn Bhd, SKG (22 October 2018 – 2 November 2018)
-
EPCC - Perform nitrogen drying for 10” PL391 to achieve dew point -20 deg C at both launcher and receiver after completion of Intelligent Pigging (IP) by ROSEN.
-
Client: SKO & SKG Petronas Carigali Sdn Bhd 2018 – Riser Maintenance Contract
-
Perform work pack preparation and project execution monitoring
Client: Petronas Carigali Sdn Bhd, PMA
-
EPCC for Pipeline isolation for valves replacement using Tecno Plug STATS Group during ANGSI Aug TA 2019
-
High Pressure High Flow Pumping utilizing single triplex pumping unit to propel the Tecno Plug

32” GUNTONG – ANDR-A pipeline
32” OSC – ANDR-A pipeline
24” SELIGI – ANDR-A pipeline

SDV changeout and piping vent header replacement

Sectional replacement pipeline underwater

Pipeline isolation for valves replacement using Tecno Plug during Onshore Slug Catcher August TA 2019
32” ANDRA – OSC for valve replacement at onshore slug catcher (OSC) facility
Client: Petronas Carigali Sdn Bhd, SKO - Miri
-
EPCC for Pipeline isolation for valves replacement using STATS Techno plug and IK High Sealing Pig during D35 and BKPA April TA 2019

High Pressure High Flow Pumping utilizing nitrogen vaporizer pump unit to propel the Tecno Plug

PL292 D35RA Pipeline Isolation via Smart Plug

PL370 BKPA Pipeline Isolation via High Sealing Pig
Client: Petronas Carigali Sdn Bhd, SKG - Bintulu

EPCC for Pipeline isolation for SDV & actuator changeout using STATS Tecno plug during B11DR-A July TA July 2019

High Pressure High Flow Pumping utilizing nitrogen vaporizer pump unit to propel the Tecno Plug

Pipeline Isolation 32" PL397 & 24" PL329 AT B11DR-A

SDV and MOVs changeout and sectional replacement underwater pipeline
Client: Petronas Carigali Sdn Bhd, SKG - Bintulu
-
EPCC for Pipeline isolation for SDV & Barrel Door changeout using STATS Tecno plug during KAKG & F9 October TA 2019
-
High Pressure High Flow Pumping utilizing nitrogen vaporizer pump unit to propel the Tecno Plug

KAKG-A PL361 28" & F9JT-A PL360 28"

SDV changeout and sectional replacement pipeline

  • Client: JX NIPPON Helang Platform- Miri (December 2019)
    -
    Generator G-7555 Major Inspection complete with commissioning
    Client: ExxonMobil Exploration Production Malaysia Inc (September 2020)
    -
    Site Inspection for 16” Pipeline for Isolation Plug Execution at Tapis-Pump
    -
    Client: Petronas Carigali Sdn Bhd (PMA & SKA)
    -
    Site Inspection/Survey for Pipeline for Isolation Plug Execution
    -
    Data Gathering consists of Pipeline Thickness, Pumping Survey, Barrel measurement, Riser UT
    EPCC Project Management Team – High pressure Pumping (Nitrogen or Treated Sea Water, Pipeline Isolation & SDV/MOV Changeout:

    PCSB PMA ANGSI-ANDRA, PMA AUGUST 2017 TA 32” GUNTONG D – ANDRA, PL40 32” ANDRA-OSC, 24” SELIGI A – ANDRA

    PCSB PMA ONSHORE SLUG CATCHER(OSC) TERMINAL, KERTEH OCTOBER 2017 TA 28” JERNEH – OSC

    PCSB SKO BARONIA BNG-B, APRIL 2018 TA
    PCSB SKG 18” PL266 BNG-B – E11R-A
    PCSB SKO - D35R-A 12” PL292 APRIL 2019 TA
    PCSB SKG - E11RB 28” PL328 JULY 2018 TA
    PCSB SKG - M1DR-A 30” PL327 AUGUST 2018 TA
    PCSB SKG MLNG-3 TRUNKLINE 5 32” JULY 2019
    PCSB SKG - E11RC 32” PL325 AUGUST 2019
    PCSB SKG - E11RB 32” PL397 AUGUST 2019
    PCSB SKG - B11DR-A – E11RB 32” PL397 AUGUST 2019
    PCSB SKG - B11DR-A – HELANG 24” PL329 AUGUST 2019
    KAKG-A PL361 28” SEPTEMBER 2019– PCSB SKG
    F9JT-A PL360 28” SEPTEMBER 2019– PCSB S
    PCSB PMA ANGSI-ANDRA, PMA AUGUST 2019 TA, 32” GUNTONG D – ANDRA, PL40 32” ANDRA-OSC & 24” SELIGI A – ANDRA

    PCSB PMA 32” OSC RECEIVER AT OSC Terminal, Kerteh
    Client: Riser Maintenance - PCSB Peninsular Malaysia Assets (PMA) (Contract January 2022 – December 2023)
    -
    Riser Maintenance at Angsi, Duyong, Dulang and TCOT
    -
    Execution of riser maintenance at TCOT July 2022
    -
    Execution of riser maintenance at ANGSI BSDPA August 2022
    -
    Execution of riser maintenance at Terminals OGT

Mechanical &Electrical(M&E) Engineer

Makarmas Tenaga Sdn Bhd
01.2013 - 12.2016
  • Collaborated with multidisciplinary teams to optimize project workflows and timelines.
  • Maintained a safe working environment, adhering strictly to established safety protocols while executing engineering tasks.
  • Contributed valuable insights during design reviews, offering informed recommendations for improving mechanical integrity or electrical performance as needed.
  • Facilitated team and sub-contractors' meetings effectively, held regular status meetings with project team and kept project team well informed of changes within the organization and general corporate news among HQ, Team & Sub-contractors.
  • Suggested areas for improvement in internal processes along with possible solutions that happened in site to the Project Manager.
  • Proactively managed changes in project scope, identified potential crises, and devised contingency plans together with Project Manager.
  • Approved team members' time and expense reports in a conscientious and timely manner while assisting project manager to review the status reports of team members and addressed issues as appropriate.
  • Complied with and helps to enforce standard policies and procedures especially the site's HSE policy
    PROJECT INVOLVED IN ELECTRICAL AND INSTRUMENTATION:
    Works/Project in charge:
  • AC Motor overhaul contract with TNB Paka – January 2014 – December 2016
    Manpower supply to TNB Remaco for CUF Kerteh (January 2016 - February 2016)
    Control & instrument work during GT-F Major Inspection at CUF Kerteh
    Manpower supply to TNB Remaco for CUF Kerteh (October 2015 - November 2015)
    Control & instrument work during Hot Gas Path Inspection GT-B at CUF Gebeng
    Manpower supply to TNB Remaco for CUF Kerteh (December 2015)
    Control & instrument work during GT-D IGV LVDT replacement at CUF Kerteh
    Battery Maintenance at SJSI, Paka, Terengganu - contract period start from August 2015 - August 2017
    Motor (APH) 6.6Kv Replacement at SJSI, Paka.
    Motor Overhauling at client facilities (Samturaga Sdn Bhd)
    Street lightning maintenance(troubleshooting) at SJSI, Paka.
    Motor installation at SJSI, Paka.
    Preventive Maintenance for Motor Control Centre (MCC) at VEOLIA Water Treatment, Dungun
    Procurement, Installation and Commissioning of IVECO Diesel Engine 3.3Kv major services at INSTEP, Batu Rakit.
    Procurement, Installation and Commissioning of IVECO Diesel Meccalte 415V top overhaul at INSTEP Batu Rakit.
    Routine electrical inspection at Kerteh Port, PETRONAS with Ir. Abdul Halim.
    Distribution board installation at Kertih Airport, lay new 16mm² cable from Motor Control Centre and commissioning.
    Install 6-unit explosion proof light and 4-unit beacon light complete with led push button at Kertih Airport.

Mechanical Works:

To Perform Amine Pump Bearing Refurbishment - PO Number 4120010576 (06/02/2013)
Supply Manpower and Tools to Perform Maintenance Work at GPP-A, Petronas Gas Berhad - PO Number SMSO/SS1/2013/0038
Prov of manpower to Perform maintenance Works for Rotating Equipment - PO Number 4120027523 (07/07/2013)
Rotating Equipment Maintenance Steam Turbine-additional work - PO Number 3920015832 08/10/2013
Prov Of Manpower, Equipment, tools, consumables & transportation for Mechanical Rotating Works for PCLDPE Sdn Bhd 4th Turnaround September - PO Number 3920019459 (15/12/2013)
Prov Of Manpower to Perform Cooler Servicing for Mac at ASU 2 Plant,CUF kerteh Terengganu - PO Number 4120033779 (20/08/2013)
SR1A140039 Condensate cooler fan overhaul for utilities Kerteh (UK) - PO Number 4120059403 (05/3/14)
SR3A140050 Prov of Manpower, Tools, Consumable & Transportation to Perform GT 18M PM & LO Replacement for Utilities Kerteh (UK) - PO Number 4120061366 (19/03/2014)
Additional works during overhaul Four (4) Units Condensate Cooler Assembly for Utilities Kerteh (UK)-2013K & 2013L - PO Number - 4120064234 (10/04/2014)
SM9S140051 TO perform Blower Structure Repair at Kerteh Shared Marine (KMSF) Flare AE-2014-Petronas Gas Berhad - PO Number 4120062861 (01.04.2014)
Replacement of Mac B Mop at Utilities Kerteh (UK), Gas Processing & Utilities (GPU) Petronas Gas Berhad -PO Number 4120065651 (22/4/2014)
Rotating Equipment Works During GPP6 Turnaround (GPP6 TA)2014 - PO Number 4120067736 (10/05/2014)
To Perform Cooling Water Pump Overhaul at Utilities Kerteh, Petronas Gas Berhad (Sulzer SM 602-800) - PO Number 4120094774 (11/01/2015)
Provision Of Manpower to Overhaul 1 (One) unit Of Steam Turbine - PO Number 4120097003 (29/01/2015)
GTD Air Filter House Repair During Gas Turbine Major Inspection Window for Utilities Kerteh (UK)-AFH GTD - PO Number 4120097037 (29/01/2015)
Overhaul Four (4) Units Condensate cooler For Utilities Kerteh(Uk), Petronas Gas Berhad 2015 - PO Number 4120101473 (10/03/2015)

Electrical Engineer

CT Electric & Services
05.2012 - 12.2012
  • Conducted thorough inspections to ensure compliance with safety standards and regulations.
  • Designed and implemented electrical systems for residential and commercial projects.
  • Collaborated with project managers to develop electrical layouts and plans.
  • Supervised installation teams, ensuring adherence to timelines and quality standards.
  • Designed, developed, and tested electrical systems for industrial and commercial applications, ensuring compliance with safety and regulatory standards.
  • Led troubleshooting and root-cause analysis for electrical faults, reducing downtime by 15% through preventive maintenance strategies.
  • Collaborated with cross-functional teams to integrate electrical components into mechanical and software systems for new product launches.
  • Prepared detailed technical documentation, schematics, and wiring diagrams to support manufacturing and maintenance teams.
  • Managed vendor relationships and oversaw procurement of electrical components, optimizing cost efficiency without compromising quality

Education

Bachelor of Engineering (Honors) - Power System Engineering, Control and Instrumentation

University Technology PETRONAS
Malaysia
04.2012

Skills

  • Project management
  • Engineering design
  • Construction management
  • Cost estimation
  • Scheduling expertise
  • Health and safety compliance
  • Planning and deployment
  • Site management
  • Project closeout

Personal Information

  • Date of Birth: 09/14/88
  • Nationality: Malaysian

Supplementary Of Competency - Additional Info

  • Oil & Gas Safety Passport (OGSP) Level 2, Valid
  • CIDB Green Card and E-Vetting Card, Valid
  • Offshore Medical Fitness Certificate & UDAT (FTW), Valid
  • TBosiet With CAEBS And TSBB And Fire Watch, Expired, 02/2026
  • PCSB Permit to Work Certification Training & Assessment, Expired, 03/2026
  • Malaysian Skills Certificate (MSC) Level 2 for Installation & Maintenance of Electrical Single Phase, Valid
  • Malaysian Skills Certificate (MSC) Level 3 for Installation & Maintenance of Electrical Three Phase, Valid
  • Tecno Plug Intermediate by STATS Group Level 1 Certified, DNV GL Type Approve
  • UT Awareness by STATS Group UK, DNV GL Type Approve
  • Test Tool Awareness by STATS Group UK, DNV GL Type Approve
  • Site Survey Tecno Plug Intermediate by STATS Group UK, DNV GL Type Approve
  • Remote Systems Intermediate Theory by STATS Group UK, DNV GL Type Approve
  • Remote Systems Awareness by STATS Group UK, DNV GL Type Approve
  • Hot Tapping Awareness by STATS Group UK, DNV GL Type Approve
  • BISEP Awareness by STATS Group UK, DNV GL Type Approve

References

  • Sang Yew Chong, General Manager, +6014 3201 128, Handal Energy Sdn Bhd (Now at EPOMS)
  • M Fairol Jusoh, Manager Facilities Improvement Project (FIC) PTS91, +6019 988 3081, Petronas Carigali Sdn Bhd

Certification

Oil & Gas Safety Passport (OGSP) Level 2 - Valid
Valid CIDB Green Card and E-Vetting Card - Valid
Valid Offshore Medical Fitness Certificate & UDAT (FTW) - Valid
TBosiet With CAEBS And TSBB And Fire Watch – Expired in February 2026
PCSB Permit to Work Certification Training & Assessment (Including Job Hazard Analysis, Confined SpaceEntry Procedures, Energy Isolation & Bypass of Safety Critical Element) Level 2 Applicant – Expired March2026
Malaysian Skills Certificate (MSC) Level 2 for Installation & Maintenance of Electrical Single Phase
Malaysian Skills Certificate (MSC) Level 3 for Installation & Maintenance of Electrical Three Phase
Tecno Plug Intermediate by STATS Group Level 1 Certified - DNV GL Type Approve
UT Awareness by STATS Group UK - DNV GL Type Approve
Test Tool Awareness by STATS Group UK - DNV GL Type Approve
Site Survey Tecno Plug Intermediate by STATS Group UK
Remote Systems Intermediate Theory by STATS Group UK -
Remote Systems Awareness by STATS Group UK

Hot Tapping Awareness by STATS Group UK
BISEP Awareness by STATS Group UK

Languages

English
Proficient
C2
Arabic
Intermediate
B1
Malay
Bilingual or Proficient (C2)

Timeline

Senior Project Engineer

Petronas Carigali Sdn Bhd
05.2023 - Current

Project Manager

Borneo Seaoffshore Engineering Sdn Bhd
01.2021 - 04.2023

Senior Project Engineer

Borneo Seaoffshore Engineering Sdn Bhd
01.2017 - 12.2020

Mechanical &Electrical(M&E) Engineer

Makarmas Tenaga Sdn Bhd
01.2013 - 12.2016

Electrical Engineer

CT Electric & Services
05.2012 - 12.2012

Bachelor of Engineering (Honors) - Power System Engineering, Control and Instrumentation

University Technology PETRONAS
Zafarul Naim Bin Jamaludin