Results-driven engineering professional with strong track record in project management and technical expertise. Adept at leading cross-functional teams and delivering projects on time and within budget. Skilled in problem-solving, resource allocation, and stakeholder communication. Known for adaptability and consistent performance in high-pressure environments.
Project Manage:
Client: Gas District Cooling (GDC) KLIA, Sepang. Selangor - (February 2021 – March 2021)
-
EPCC HOT SECTION EXCHANGE PROGRAM for Gas Turbine Generator (GTG) LM2500 GT6001B
-
Major inspection Generator Unit GT6001B
Client: Petronas MLNG – Bintulu (May -June 2021)
-
EPCC Pipeline isolation for MOVs changeout using STATS Techno plug during MLNG TA 2021
-
High Pressure High Flow Pumping utilizing nitrogen vaporizer pump unit to propel the Tecno Plug
Client: Gas District Cooling (GDC) KLIA, Sepang. Selangor - (January 2022 – February 2022)
-
EPCC HOT SECTION EXCHANGE PROGRAM for Gas Turbine Generator (GTG) LM2500 GT6001A
-
Major inspection Generator Unit GT6001A
-
Turbine Mid Frame installation
Client: ExxonMobil Exploration & Production Malaysia Inc. - EPCC Pipeline isolation for SDV changeout 16” Tapis – TCOT Site Survey (March 2022)
Client: EPOMS & Vestigo - EPCC Pipeline isolation/positive isolation utilizing mechanical plug for SDV615 changeout 12”
Larut-A To Guntong-D Site Survey and Shutdown July 2022
Client: Petronas Carigali Sdn Bhd, PMA
-
EPCC - Pipeline isolation for valves replacement using TDW Smartplug during ANGSI July / Aug TA (19 July – 20 Aug 2017).
32” GUNTONG – ANDR-A pipeline (to replace MOV2921, SDV2923)
32” OSC – ANDR-A pipeline (to replace MOV2904, SDV 2900)
24” SELIGI – ANDR-A pipeline (MOV2930)
Pipeline isolation for valves replacement using TDW Smartplug during Onshore Slug Catcher October TA 2018
-
High Pressure High Flow Pumping utilizing single triplex pumping unit to propel the Smart Plug
28” JERNEH – OSC for valve replacement at onshore slug catcher (OSC) facility on 15th October 2017 – 1st November 2017
Client: Petronas Carigali Sdn Bhd, SKO - Miri
-
EPCC Pipeline isolation for valves replacement using STATS Techno plug and IK High Sealing Pig during Baronia April TA (22 April 2018 – 30 April 2018).
-
High Pressure High Flow Pumping utilizing nitrogen vaporizer pump unit to propel the Tecno Plug
18” PL266 from BNG-B – E11R-A (ABV-9601 to be replaced)
18” PL284 from BNDP-I – BNG-B (ABV-9101 to be replaced)
SDV and MOVs changeout and sectional replacement pipeline
Client: Petronas Carigali Sdn Bhd, SKG - Bintulu
EPCC Pipeline isolation for SDV2917 actuator changeout using STATS Techno plug during M1 August/September TA (30 Aug 2018–13 September 2018).
High Pressure High Flow Pumping utilizing nitrogen vaporizer pump unit to propel the Tecno Plug
30” PL327 from M1DR-A – E11R-C (Actuator for SDV2917 to be replaced)
Client: Bintulu Integrated Facility - Petronas Carigali Sdn Bhd, SKG (22 October 2018 – 2 November 2018)
-
EPCC - Perform nitrogen drying for 10” PL391 to achieve dew point -20 deg C at both launcher and receiver after completion of Intelligent Pigging (IP) by ROSEN.
-
Client: SKO & SKG Petronas Carigali Sdn Bhd 2018 – Riser Maintenance Contract
-
Perform work pack preparation and project execution monitoring
Client: Petronas Carigali Sdn Bhd, PMA
-
EPCC for Pipeline isolation for valves replacement using Tecno Plug STATS Group during ANGSI Aug TA 2019
-
High Pressure High Flow Pumping utilizing single triplex pumping unit to propel the Tecno Plug
32” GUNTONG – ANDR-A pipeline
32” OSC – ANDR-A pipeline
24” SELIGI – ANDR-A pipeline
SDV changeout and piping vent header replacement
Sectional replacement pipeline underwater
Pipeline isolation for valves replacement using Tecno Plug during Onshore Slug Catcher August TA 2019
32” ANDRA – OSC for valve replacement at onshore slug catcher (OSC) facility
Client: Petronas Carigali Sdn Bhd, SKO - Miri
-
EPCC for Pipeline isolation for valves replacement using STATS Techno plug and IK High Sealing Pig during D35 and BKPA April TA 2019
High Pressure High Flow Pumping utilizing nitrogen vaporizer pump unit to propel the Tecno Plug
PL292 D35RA Pipeline Isolation via Smart Plug
PL370 BKPA Pipeline Isolation via High Sealing Pig
Client: Petronas Carigali Sdn Bhd, SKG - Bintulu
EPCC for Pipeline isolation for SDV & actuator changeout using STATS Tecno plug during B11DR-A July TA July 2019
High Pressure High Flow Pumping utilizing nitrogen vaporizer pump unit to propel the Tecno Plug
Pipeline Isolation 32" PL397 & 24" PL329 AT B11DR-A
SDV and MOVs changeout and sectional replacement underwater pipeline
Client: Petronas Carigali Sdn Bhd, SKG - Bintulu
-
EPCC for Pipeline isolation for SDV & Barrel Door changeout using STATS Tecno plug during KAKG & F9 October TA 2019
-
High Pressure High Flow Pumping utilizing nitrogen vaporizer pump unit to propel the Tecno Plug
KAKG-A PL361 28" & F9JT-A PL360 28"
SDV changeout and sectional replacement pipeline
Mechanical Works:
To Perform Amine Pump Bearing Refurbishment - PO Number 4120010576 (06/02/2013)
Supply Manpower and Tools to Perform Maintenance Work at GPP-A, Petronas Gas Berhad - PO Number SMSO/SS1/2013/0038
Prov of manpower to Perform maintenance Works for Rotating Equipment - PO Number 4120027523 (07/07/2013)
Rotating Equipment Maintenance Steam Turbine-additional work - PO Number 3920015832 08/10/2013
Prov Of Manpower, Equipment, tools, consumables & transportation for Mechanical Rotating Works for PCLDPE Sdn Bhd 4th Turnaround September - PO Number 3920019459 (15/12/2013)
Prov Of Manpower to Perform Cooler Servicing for Mac at ASU 2 Plant,CUF kerteh Terengganu - PO Number 4120033779 (20/08/2013)
SR1A140039 Condensate cooler fan overhaul for utilities Kerteh (UK) - PO Number 4120059403 (05/3/14)
SR3A140050 Prov of Manpower, Tools, Consumable & Transportation to Perform GT 18M PM & LO Replacement for Utilities Kerteh (UK) - PO Number 4120061366 (19/03/2014)
Additional works during overhaul Four (4) Units Condensate Cooler Assembly for Utilities Kerteh (UK)-2013K & 2013L - PO Number - 4120064234 (10/04/2014)
SM9S140051 TO perform Blower Structure Repair at Kerteh Shared Marine (KMSF) Flare AE-2014-Petronas Gas Berhad - PO Number 4120062861 (01.04.2014)
Replacement of Mac B Mop at Utilities Kerteh (UK), Gas Processing & Utilities (GPU) Petronas Gas Berhad -PO Number 4120065651 (22/4/2014)
Rotating Equipment Works During GPP6 Turnaround (GPP6 TA)2014 - PO Number 4120067736 (10/05/2014)
To Perform Cooling Water Pump Overhaul at Utilities Kerteh, Petronas Gas Berhad (Sulzer SM 602-800) - PO Number 4120094774 (11/01/2015)
Provision Of Manpower to Overhaul 1 (One) unit Of Steam Turbine - PO Number 4120097003 (29/01/2015)
GTD Air Filter House Repair During Gas Turbine Major Inspection Window for Utilities Kerteh (UK)-AFH GTD - PO Number 4120097037 (29/01/2015)
Overhaul Four (4) Units Condensate cooler For Utilities Kerteh(Uk), Petronas Gas Berhad 2015 - PO Number 4120101473 (10/03/2015)
Oil & Gas Safety Passport (OGSP) Level 2 - Valid
Valid CIDB Green Card and E-Vetting Card - Valid
Valid Offshore Medical Fitness Certificate & UDAT (FTW) - Valid
TBosiet With CAEBS And TSBB And Fire Watch – Expired in February 2026
PCSB Permit to Work Certification Training & Assessment (Including Job Hazard Analysis, Confined SpaceEntry Procedures, Energy Isolation & Bypass of Safety Critical Element) Level 2 Applicant – Expired March2026
Malaysian Skills Certificate (MSC) Level 2 for Installation & Maintenance of Electrical Single Phase
Malaysian Skills Certificate (MSC) Level 3 for Installation & Maintenance of Electrical Three Phase
Tecno Plug Intermediate by STATS Group Level 1 Certified - DNV GL Type Approve
UT Awareness by STATS Group UK - DNV GL Type Approve
Test Tool Awareness by STATS Group UK - DNV GL Type Approve
Site Survey Tecno Plug Intermediate by STATS Group UK
Remote Systems Intermediate Theory by STATS Group UK -
Remote Systems Awareness by STATS Group UK
Hot Tapping Awareness by STATS Group UK
BISEP Awareness by STATS Group UK